Pages that link to "07-60-302"
Jump to navigation
Jump to search
The following pages link to 07-60-302:
Displayed 19 items.
- ML050970042 (← links)
- ML20029D767 (← links)
- ML20128N198 (← links)
- 3F0787-01, Forwards Rev 8 to FSAR for Crystal River Unit 3,reflecting Changes to Facility Through 861231.Addl 10CFR50.59 Safety Evaluations Which Have Been Performed Since 870101 & Supplementing Those Provided in Util Also Encl (← links)
- 3F0886-02, Responds to NRC 860630 Nine Questions & 860731 Telcon Re SPDS & Suppl 1 to NUREG-0737 (← links)
- 3F0897-22, Application for Amend to License DPR-72,TS Change Request Notice 215,extending Frequency of EDG Surveillances During Period of Time CR-3 EDGs Are Being Modified (← links)
- 3F0597-14, Forwards Request for Exemption from Requirements of 10CFR70.24(a), Criticality Accident Requirements, for CR-3.Request Involves No Changes to Radiation Monitoring Instrumentation,Plant Equipment or Emergency Procedures (← links)
- 3F0697-23, Confirms That FPC Has Implemented Administrative Controls, Revised PORV Setpoint & Revises Commitment to Submit TS Change Request for LTOP Features at Plant (← links)
- 3F0497-14, Responds to NRC Re Violations Noted in Insp Rept 50-302/97-01.Corrective Actions:Walkdown of Outstanding Tagging Orders & Review of Tags on Local Control Stations Was Conducted (← links)
- 3F1296-13, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/96-06.Corrective Actions:Subsequent Full 10CFR50.59 Evaluation Was Completed (← links)
- 3F0292-07, Monthly Operating Rept for Jan 1992 for Crystal River, Unit 3 (← links)
- 3F0192-07, Monthly Operating Rept for Dec 1991 for Crystal River Unit 3 (← links)
- 3F0795-04, Monthly Operating Rept for June 1995 for Crystal River Unit 3 (← links)
- 3F1194-10, Submits Preliminary Results of Refuel 9 OTSGs Tube Pull,Per Commitment in Response to 940426 Cal,Item 8.Preliminary Rept, Exam of Crystal River-3 Pulled SG Tubes Encl.Final Rept Will Be Provided by 950531 (← links)
- 3F1090-02, Suppls 900418 Rept of LOCA Peak Cladding Temp to Close Issue of Changes in LOCA Evaluation Model (← links)
- 3F1193-03, Monthly Operating Rept for Oct 1993 for Crystal River Unit 3 (← links)
- 3F0194-06, Monthly Operating Rept for Dec 1993 for Crystal River Unit 3 (← links)
- 3F0993-06, Responds to IEB-93-002, Debris Plugging of ECCS Strainers. Ventilation Filters in Unit 3 Bldg Removed (← links)
- ML20055E514 (← links)