Pages that link to "TXX-6625, Interim Deficiency Rept CP-85-19 Re Design Requirements & Documents for safety-related Plant Conduit & Conduit Supports.Initially Reported on 861021.Revised Calculation Based on Effective Thread Dimension.Next Rept by 871009"
Jump to navigation
Jump to search
The following pages link to TXX-6625, Interim Deficiency Rept CP-85-19 Re Design Requirements & Documents for safety-related Plant Conduit & Conduit Supports.Initially Reported on 861021.Revised Calculation Based on Effective Thread Dimension.Next Rept by 871009:
Displayed 2 items.
- ML20237H194 (redirect page) (← links)
- TXX-6625 (redirect page) (← links)
- TXX-6625, Interim Deficiency Rept CP-85-19 Re Design Requirements & Documents for safety-related Plant Conduit & Conduit Supports.Initially Reported on 861021.Revised Calculation Based on Effective Thread Dimension.Next Rept by 871009 (← links)
- TXX-6806, Final Deficiency Rept CP-85-19 Re Use of Nonrepresentative Sample in Determining Typical Conduit Span Calculations. Initially Reported on 861021.Evaluation Using Revised Design Criteria Identified No Overstressed Conduit Spans (← links)