Pages that link to "TXX-6278, Interim Deficiency Rept CP-85-39 Re Equipment Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918.Evaluation of Sample Results Adequacy to Entire Cable Population in Progress.Next Rept by 870515"
Jump to navigation
Jump to search
The following pages link to TXX-6278, Interim Deficiency Rept CP-85-39 Re Equipment Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918.Evaluation of Sample Results Adequacy to Entire Cable Population in Progress.Next Rept by 870515:
Displayed 2 items.
- ML20210V449 (redirect page) (← links)
- TXX-6278 (redirect page) (← links)
- TXX-6438, Interim Deficiency Rept CP-85-39 Re Failure to Install Equipment Conduit in Accordance W/Design Documents.Initially Reported on 860918.Evaluation of Condition Underway.Next Rept Will Be Submitted by 870622 (← links)
- TXX-6278, Interim Deficiency Rept CP-85-39 Re Equipment Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918.Evaluation of Sample Results Adequacy to Entire Cable Population in Progress.Next Rept by 870515 (← links)