Pages that link to "TXX-6046, Interim Deficiency Rept CP-85-19 Re Conduit Support Spans. Initially Reported on 850515.Field Verifications & Engineering Evaluations Continuing for Unit 1.Design Verification Conducted for Unit 2.Next Rept by 870310"
Jump to navigation
Jump to search
The following pages link to TXX-6046, Interim Deficiency Rept CP-85-19 Re Conduit Support Spans. Initially Reported on 850515.Field Verifications & Engineering Evaluations Continuing for Unit 1.Design Verification Conducted for Unit 2.Next Rept by 870310:
Displayed 2 items.
- ML20215L969 (redirect page) (← links)
- TXX-6046 (redirect page) (← links)
- TXX-6625, Interim Deficiency Rept CP-85-19 Re Design Requirements & Documents for safety-related Plant Conduit & Conduit Supports.Initially Reported on 861021.Revised Calculation Based on Effective Thread Dimension.Next Rept by 871009 (← links)
- TXX-6806, Final Deficiency Rept CP-85-19 Re Use of Nonrepresentative Sample in Determining Typical Conduit Span Calculations. Initially Reported on 861021.Evaluation Using Revised Design Criteria Identified No Overstressed Conduit Spans (← links)
- TXX-6046, Interim Deficiency Rept CP-85-19 Re Conduit Support Spans. Initially Reported on 850515.Field Verifications & Engineering Evaluations Continuing for Unit 1.Design Verification Conducted for Unit 2.Next Rept by 870310 (← links)
- TXX-6421, Interim Deficiency Rept CP-85-19 Re Generic Values for Conduit Span Calculations.Initially Reported on 861021. Conduit & Conduit Support Sys Currently Undergoing 100% Design Verification.Next Rept to Be Submitted 870812 (← links)