Pages that link to "RS-21-011, Subsequent Request for Exemption from Part 26 Work Hours Requirements"
Jump to navigation
Jump to search
The following pages link to RS-21-011, Subsequent Request for Exemption from Part 26 Work Hours Requirements:
Displayed 50 items.
- RS-17-157, Supplemental Information Regarding the Third Interval Containment Inservice Inspection (Cisi) Schedule for LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (← links)
- RS-17-133, Additional Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (← links)
- RS-17-131, Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (← links)
- RS-15-291, NRC Review of LaSalle County Station Ultimate Heat Sink License Amendment Request (← links)
- RS-13-207, License Amendment Request to Revise Loss of Voltage Relay Settings for 4.16 Kv ESF Buses (← links)
- RS-12-061, License Amendment Request Regarding the Removal of License Conditions Addressing Interim Configurations of the LaSalle County Station Unit 2 SFP (← links)
- RS-12-154, LaSalle County Station, Units 1 and 2 - Supplemental Information Related to License Amendment Request to Technical Specification 3.7.3, Ultimate Heat Sink (← links)
- RS-10-001, LaSalle, Units 1 and 2, Attachment 10 - Cameron International Corporation, Application for Withholding Proprietary Information from Public Disclosure (← links)
- RS-10-001, LaSalle, Units 1 and 2, Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate (← links)
- RS-10-007, LaSalle County Station, Units 1 and 2 - Request for License Amendment to Allow Receipt and Storage of Low-Level Radioactive Waste (← links)
- RS-09-133, LaSalle, Units 1 & 2 - License Amendment Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks (← links)
- RS-08-132, LaSalle County Station, Units 1 and 2 - Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5 (← links)
- RS-07-016, Response to LaSalle County Station, Units 1 & 2 - Denial of License Amendment (← links)
- ML061430246 (← links)
- RS-05-172, Additional Information Supporting the License Amendment Request to Extend the Completion Times Related to Technical Specifications Associated with Residual Heat Removal Service Water, Diesel Generator Cooling Water & the Opposite Unit Divi (← links)
- RS-17-147, Response to Request for Additional Information Regarding LaSalle County Station Fourth Inservice Inspection Interval Relief Request 14R-01 (← links)
- RS-17-099, Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch) (← links)
- RS-14-199, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- RS-13-257, Updated Request for Relaxation of Confirmatory Order EA-04-170 (← links)
- RS-18-058, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under ... (← links)
- RS-18-036, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- RS-18-010, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-BeyondDesign-Basis External Events (← links)
- RS-17-094, Ninth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) (← links)
- RS-14-260, Response to Request for Additional Information Regarding Request for Withholding Information from Public Disclosure by GE-Hitachi Nuclear Energy Americas LLC (← links)
- RS-14-265, Response to Request for Additional Information Regarding Request for Withholding Information from Public Disclosure by Electric Power Research Institute, Inc (← links)
- RS-14-111, Supplemental Response to NRC Request for Information Pursuant to 10CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- RS-13-095, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- RS-13-063, Additional Information Supporting License Amendment Request to Revise Technical Specification 2.1.1.2 for Minimum Critical Power Ratio Safety Limit for Cycle 15 (← links)
- RS-13-050, Additional Information Supporting License Amendment Request to Revise Technical Specification 2.1.1.2 for Minimum Critical Power Ratio Safety Limit - Cycle 15 (← links)
- RS-13-003, Response to Request for Additional Information Supporting License Amendment Request to Revise Technical Specification 2.1.1.2 for Minimum Critical Power Ratio Safety Limit - Cycle 15 (← links)
- RS-12-184, Request to Revise Technical Specification 2.1.1.2 for Minimum Critical Power Ratio Safety Limit - Cycle 15 (← links)
- RS-12-003, Withdrawal of License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks and the Timeline for Implementation (← links)
- RS-11-157, License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks and the Timeline for Implementation (← links)
- RS-11-149, Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit (← links)
- RS-10-089, Supplemental Response to Generic Letter 2008-01 (← links)
- RS-17-120, Supplemental Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis (← links)
- RS-17-100, Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits (← links)
- RS-17-102, Response to Request for Supplemental Information Regarding Fourth Inservice Inspection Interval Relief Request 14R-01 (← links)
- RS-17-098, Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch) (← links)
- RS-17-087, Withdrawal of Inservice Inspection Relief Request I4R-03 Re Examination of the Reactor Pressure Vessel (RPV) Stabilizer Bracket Welds Due to Impracticality (← links)
- RS-17-024, Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation Valves (← links)
- RS-16-125, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- RS-15-279, Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. (← links)
- RS-15-201, Response to NRC Request for Additional Information, Dated June 25, 2015, Regarding License Renewal Application, Environmental Review (← links)
- RS-15-198, Request for Schedule Change Related to Advisory Committee on Reactor Safeguards (ACRS) Subcommittee Review of License Renewal Application (TAC Nos. MF5347 and MF5346) (← links)
- RS-15-081, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- RS-15-020, Fourth Six-Month Status Report to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-15-029, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- RS-15-011, Proposed Alternative to the Examination Requirements for Nozzle-to-Vessel Welds and Inner Radii Sections in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RS-14-303, First Six-Month Status Report Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)