Pages that link to "RA-24-0203, Regulatory Conference Supporting Information"
Jump to navigation
Jump to search
The following pages link to RA-24-0203, Regulatory Conference Supporting Information:
Displayed 50 items.
- ML21236A286 (← links)
- RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (← links)
- RA-21-0265, Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core (← links)
- RA-21-0276, Duke Energy Common Emergency Plan and Brunswick Steam Electric Plant and Catawba Nuclear Station Emergency Plan Annexes, Revision 1 Summary of Changes (← links)
- RA-21-0283, Commitment Change Evaluation Report for 2020 to October 28, 2021 (← links)
- RA-21-0303, Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Revisions 1, 2, and 3 (← links)
- ML21336A142 (← links)
- ML21327A211 (← links)
- ML21322A326 (← links)
- RA-21-0327, Submittal of 30-Day Report Per 10CFR26.719(c) - Unsatisfactory Performance of a Health and Human Services Certified Lab (← links)
- RA-21-0329, Core Operating Limits Report Cycle 25 Reload Core, Rev. 1 (← links)
- RA-21-0321, Response to Request for Additional Information (RAI) Regarding Refuel 24 (C2R24) Inservice Inspection (ISI) and Steam Generator Inspection (SG-ISI) Report (← links)
- RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility (← links)
- RA-22-0035, Request Consideration of Hardship for 2022 Triennial Force-on-Force Exercise (← links)
- RA-21-0144, Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant (← links)
- RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (← links)
- RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative (← links)
- RA-22-0021, Refuel 26 (C1 R26) Inservice Inspection (ISI) Report (← links)
- ML22067A199 (← links)
- RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition (← links)
- RA-22-0097, Core Operating Limits Report (COLR) for Unit 2 Cycle 25 Reload Core, Rev. 2 (← links)
- RA-22-0014, Duke Energy Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations (← links)
- RA-22-0114, Duke Energy Carolinas, LLC and Duke Energy Progress, LLC Submittal of 10CFR26.719(c)(1) Report of Unsatisfactory Performance of Health and Human Services Certified Laboratory (← links)
- RA-22-0009, Duke Energy Carolinas, LLC - Onsite Property Insurance Coverage (← links)
- RA-21-0188, Submittal of Updated Final Safety Analysis Report (Revision 22), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, and 10 CFR 50.59 Evaluation Summary Report (← links)
- RA-22-0149, Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System (← links)
- RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.46 (← links)
- RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 (← links)
- RA-22-0115, Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection Nozzle (← links)
- ML22109A212 (← links)
- RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System (← links)
- RA-22-0102, Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology (← links)
- RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory (← links)
- RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes (← links)
- RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility (← links)
- RA-22-0205, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks (← links)
- RA-22-0180, Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant (← links)
- RA-22-0195, Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection Nozzle (← links)
- RA-22-0201, Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections (← links)
- RA-22-0220, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks (← links)
- ML22251A235 (← links)
- RA-22-0218, Emergency Action Level (EAL) Technical Basis Document, Revision 3 (← links)
- RA-22-0266, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core (← links)
- ML22336A038 (← links)
- RA-22-0331, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 1 (← links)
- RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab (← links)
- RA-22-0608, Refuel 25 (C2R25) Inservice Inspection (ISI) Report (← links)
- RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements (← links)