Pages that link to "RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core."
Jump to navigation
Jump to search
The following pages link to RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.:
Displayed 50 items.
- ML17205A233 (← links)
- ML16116A033 (← links)
- ML14188B015 (← links)
- ML12263A424 (← links)
- ML18038B289 (← links)
- ML18099A130 (← links)
- ML18130A807 (← links)
- RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications (← links)
- RA-16-012, Request to Consolidate 10 CFR Part 71 Quality Assurance Program Approvals for Radioactive Material Packages at Exelon Generation Company, LLC Nuclear Power Plants (← links)
- RA-12-031, Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones (← links)
- RA-11-010, Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50 (← links)
- ML093631212 (← links)
- ML082830137 (← links)
- RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform (← links)
- RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses (← links)
- RA-17-0012, Withholding of Proprietary Information in DPC-NE-3008 - Request for Additional Information (RAI) (← links)
- RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications (← links)
- RNP-RA/16-0057, License Amendment Request to Modify the Licensing Basis Alternate Source Term (← links)
- RNP-RA/10-0117, Request for Technical Specification Changes to Section 3.8.3, Diesel Fuel Oil and Starting Air, and Section 3.8.5, DC Sources - Shutdown (← links)
- ML063410470 (← links)
- ML062130637 (← links)
- RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (← links)
- RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (← links)
- RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces (← links)
- RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process (← links)
- RA-13-0022, Carolina Power and Light Company'S Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirement for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12 (← links)
- RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers (← links)
- RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions (← links)
- RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/16-0044, Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (← links)
- RNP-RA/15-0117, Supplement to Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/15-0090, Proposed Amendment to Technical Specification 5.5.16 for the Adoption of Option B of 10 CFR 50, Appendix J for Type B and Type C Testing and the Permanent Change in 10 CFR 50, Appendix J, Integrated Leak Rate Test Interval And.. (← links)
- RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.46 (← links)
- RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits (← links)
- RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions (← links)
- RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication (← links)
- RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions (← links)
- RNP-RA/13-0117, License Amendment Request to Modify Technical Specification 3.3.1, Reactor Protection System (RPS) Instrumentation (← links)
- RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications (← links)
- RA-13-0051, License Amendment Request to Modify Technical Specification 3.8.1 Proposed Changes to Diesel Generator Testing Requirements (← links)
- RNP-RA/13-0002, License Amendment Request to Modify Technical Specification 3.1.7 to Delete the Monthly Rod Position Indication Surveillance Requirements (← links)
- RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions (← links)
- RNP-RA/12-0057, License Amendment Request for Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection and Application of Permanent Alternate Repair Criteria (H*) (← links)
- RNP-RA/12-0028, Request for Technical Specification Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication (← links)
- RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process (← links)
- RA-11-012, Regarding Response to Request for Additional Information-Reactor Vessel Beltline Weld Relief Request (RR-23) (ME5407) (← links)
- RNP-RA/10-0024, Request for Emergency Technical Specifications Change to Section 3.4.17, Chemical and Volume Control System (CVCS) (← links)
- RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation (← links)
- RA-09-019, Request for Exemptions from Physical Security Requirements (← links)
- RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program (← links)