Pages that link to "RA-20-0296, Letter from Sabrina Salazar (Duke Energy) to NRC Document Control Desk, Cycle 23 Core Operating Limits Report (Colr), Revision 2, Dated June 19, 2020"
Jump to navigation
Jump to search
The following pages link to RA-20-0296, Letter from Sabrina Salazar (Duke Energy) to NRC Document Control Desk, Cycle 23 Core Operating Limits Report (Colr), Revision 2, Dated June 19, 2020:
Displayed 42 items.
- ML12100A086 (← links)
- ML090970247 (← links)
- ML072950369 (← links)
- ML060950121 (← links)
- RA-18-0170, Unit 1 Cycle 22 and Unit 2 Cycle 23 Core Operating Limits Reports (← links)
- RA-18-0101, Unit 1 Cycle 22 and Unit 2 Cycle 23 Reload Safety Analysis Reports (← links)
- BSEP-06-0061, Core Operating Limits Report (Colr), Revision 2 for Plant Cycle 17 (← links)
- RA-19-0162, Cycle 24 Core Operating Limits Report (COLR) (← links)
- BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR) (← links)
- BSEP 17-0032, Cycle 23 Core Operating Limits Report (COLR) (← links)
- BSEP 15-0048, Cycle 22 Startup Report (← links)
- BSEP 15-0036, Submittal of Core Operating Limits Report (Colr), Revision 1 for Cycle 20 (← links)
- BSEP 15-0022, Cycle 22 Core Operating Limits Report (COLR) (← links)
- BSEP 14-0033, Cycle 20 Core Operating Limits Report (COLR) (← links)
- BSEP 13-0039, Submittal of Cycle 21 Core Operating Limits Report (COLR) (← links)
- BSEP 12-0018, Submittal of Confirmatory Evaluation for Cycle 19 (← links)
- BSEP 10-0050, Cycle 18 Core Operating Limits Report (← links)
- BSEP 09-0054, Core Operating Limits Report, Revision 2 for Unit 1 Cycle 17 (← links)
- BSEP 08-0097, Cycle 17 Core Operating Limits Report, Revision 1 (← links)
- BSEP 08-0093, Cycle 18 Core Operating Limits Report, Revision 1 (← links)
- BSEP 08-0096, Cycle 17 Startup Report (← links)
- BSEP 08-0047, Cycle 17 Core Operating Limits Report (← links)
- BSEP 07-0034, Core Operating Limits Report, Revision 1 for Unit 1 Cycle 16 (← links)
- BSEP 07-0026, Enclosure 1 - Design Calc. 21321-1267, Revision 0, Brunswick, Unit 2, Cycle 18 Core Operating Limits Report March 2007. (← links)
- BSEP 06-0034, Supplemental Reload Licensing Report for Brunswick, Unit 1, Reload 15 Cycle 16, December 2005 (← links)
- BSEP-05-0139, Core Operating Limits Report (Colr), Revision 1 for Unit 2, Cycle 17 (← links)
- BSEP 05-0087, Core Operating Limits Report (COLR) for Unit 1 Cycle 15, Revision 1 (← links)
- BSEP-05-0024, Design Calculation No. 2821-1064, Rev 0, Brunswick Unit 2, Cycle 17 Core Operating Limits Report, February 2005. (← links)
- ML040960082 (← links)
- BSEP 04-0012, Cycle 16 Core Operating Limits Report (← links)
- BSEP 03-0168, Cycle 14 Core Operating Limits Report (← links)
- BSEP 02-0108, Cycle 14 Core Operating Limits Report, Supplemental Reload Licensing Report & Loss-Of-Coolant Accident Analysis Report for Operation with Extended Power Uprate (← links)
- RA-20-0091, Unit 1 Cycle 23 Core Operating Limits Report (COLR (← links)
- BSEP 02-0059, Unit 1 Cycle 14 Core Operating Limit Report, Supplemental Reload Licensing Report, Loss-of-Coolant Accident Analysis Report & Plant-Specific Emergency Core Cooling System (ECCS) Evaluation (← links)
- RA-20-0118, Cycle 23 Operating Limits Report (COLR) Revision 1 (← links)
- RA-20-0217, Cycle 23 Startup Report (← links)
- RA-20-0168, Cycle 23 Core Operating Limits Report (COLR) Revision 2 (← links)
- RA-21-0098, Unit 2 Cycle 25 Core Operating Limits Report (COLR) and Reload Safety Analysis Report (RSAR) (← links)
- RA-20-0296 (redirect page) (← links)
- ML21174A291 (redirect page) (← links)
- RA-22-0095, Unit 1 Cycle 24 Core Operating Limits Report (COLR) (← links)
- RA-23-0021, Unit 2 Cycle 26 Core Operating Limits Report (COLR) (← links)