Pages that link to "RA-19-0418, Proposed Alternative for Inservice Inspection of Containment Post-Tensioning System Components"
Jump to navigation
Jump to search
The following pages link to RA-19-0418, Proposed Alternative for Inservice Inspection of Containment Post-Tensioning System Components:
Displayed 14 items.
- RA-20-0328, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals (← links)
- RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4 (← links)
- RA-19-0418 (redirect page) (← links)
- ML21126A002 (redirect page) (← links)
- ML21146A178 (← links)
- ML21335A106 (← links)
- EPID:L-2021-LLR-0034 (← links)
- ML21146A178 (← links)
- RA-21-0169, Relief Requests for Inservice Testing Plan - Sixth Interval (← links)
- ML21335A106 (← links)
- ML22019A135 (← links)
- RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI (← links)
- RA-23-0018, Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 (← links)
- RA-22-0174, Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems. (← links)
- ML23262A967 (← links)