Pages that link to "RA-19-0138, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections"
Jump to navigation
Jump to search
The following pages link to RA-19-0138, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections:
Displayed 50 items.
- ML16112A275 (← links)
- ML110330085 (← links)
- RA-11-008, Progress Energy - Evidence of Guarantee of Payment of Deferred Premiums (← links)
- RNP-RA/15-0081, Submittal of Ninety-Day Inservice Inspection Summary Report (← links)
- RNP-RA/14-0061, Submittal of Snubber Examination and Testing Program (← links)
- RNP-RA/14-0040, Relief Request (RR)-10 for Expanded Applicability for Use of ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Per 10 CFR 50.55(a)(3)(i) (← links)
- RNP-RA/13-0072, Request for Site-Specific Information Related to Use of Gothic Be Withheld from Public Disclosure in Accordance with 10 CFR 2.390(a)(4) (← links)
- RNP-RA/12-0119, Supplemental Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (SI-837) for Fifth Ten-Year Inservice Inspection Program... (← links)
- RNP-RA/12-0056, Response to NRC Request for Additional Information for the Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- RNP-RA/12-0023, Inservice Inspection Program for the Fifth Ten-Year Interval (← links)
- RNP-RA/10-0091, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RNP-RA/15-0063, Submittal of Ninety Day Inservice Inspection Summary Report - Supplement (← links)
- RNP-RA/06-0001, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RA-18-0185, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.46 Annual Report, Including Revised Robinson Large Break Loss of Coolant Accident Report (← links)
- RA-19-0094, Refuel 31 (R231) Owner'S Activity Report, Fifth 10-Year Inservice Inspection Interval (← links)
- RA-18-0016, Response to Request for Additional Information Regarding Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses (← links)
- RA-17-0048, Transmittal of Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-3009, Rev. 0 (Part 2) (← links)
- RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report (← links)
- RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report (← links)
- RA-16-0023, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-1008-P (← links)
- RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. (← links)
- RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) (← links)
- RA-15-0037, Transmittal of Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 (← links)
- RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. (← links)
- RNP-RA/14-0014, Submittal of Ninety Day Inservice Inspection Summary Report (← links)
- RNP-RA/12-0067, Response to the NRC Request for Additional Information Regarding Inservice Inspection Program Plan for the Fifth Ten-Year Interval (← links)
- RNP-RA/12-0063, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RNP-RA/12-0064, Response to NRC Request for Additional Information Related to Relief Requests (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- RNP-RA/12-0017, Inservice Testing Program Plan for the Fifth-Ten Year Interval (← links)
- RNP-RA/09-0010, Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 25 (← links)
- RNP-RA/08-0047, Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results (← links)
- RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System (← links)
- RNP-RA/07-0077, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RA-15-0004, Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermalhydraulic Statistical Core Design Methodology (← links)
- RNP-RA/09-0054, Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System Instrumentation (← links)
- RA-19-0106, Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head (← links)
- RA-19-0138 (redirect page) (← links)
- RA-19-0138, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections (← links)
- RA-20-0048, Response to Request for Additional Information for Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections (← links)
- ML20063L456 (← links)
- ML20090F893 (← links)
- ML19204A082 (redirect page) (← links)
- RNP-RA/05-0062, Response to Request for Additional Information Regarding Technical Specifications Change Request to Section 3.8.4 DC Sources - Operating (← links)
- RNP-RA/05-0039, Response to NRC Request for Additional Information Regarding Loss of Coolant Accident Alternative Source Term Dose Analysis (← links)
- RNP-RA/04-0110, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RA-20-0048, Response to Request for Additional Information for Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections (← links)
- RNP-RA/03-0034, Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements (← links)
- EPID:L-2019-LLR-0072 (← links)
- ML20063L456 (← links)
- RNP-RA/03-0018, Submittal of 90 Day Inservice Inspection Summary Report (← links)
- RNP-RA/02-0065, Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program (← links)
- ML020570311 (← links)
- ML20090F893 (← links)
- RA-20-0382, 30-Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Acceptable Loss of Coolant Evaluation Model (← links)