Pages that link to "PNO-III-97-065"
Jump to navigation
Jump to search
The following pages link to PNO-III-97-065:
Displayed 2 items.
- PNO-III-97-065, on 970805,Westinghouse Circuit Breaker Failed to Open on Demand During Planned Change of Pumps in RHR Sys. RHR Sys Provides Reactor Cooling While Plant Shut Down.Nrc Augmented Insp Team Dispatched to Plant to Review Breaker (← links)
- PNO-III-97-065A, on 970805,Westinghouse Circuit Breaker Failed to Open Signal During Planned Switch of Pumps in RHR Sys Update Made.Licensee Investigation Attributed Failure to Lack of Appropriate Maint (← links)