Pages that link to "PNO-II-89-063, on 890905,spill of Approx 10,000 Gallons of Contaminated Water Into Auxiliary Bldg Occurred.Caused by Overpressurization of Primary Sys Pressure Allowed to Pressurize Train a Containment Designed for 220 Psi"
Jump to navigation
Jump to search
The following pages link to PNO-II-89-063, on 890905,spill of Approx 10,000 Gallons of Contaminated Water Into Auxiliary Bldg Occurred.Caused by Overpressurization of Primary Sys Pressure Allowed to Pressurize Train a Containment Designed for 220 Psi:
Displayed 9 items.
- PNO-II-97-033, on 970614,extended Shutdown Due to Steady Increases Detected in SG 2A Primary to Secondary Tube Leakage.Nrc Resident Inspector Will Followup on Licensee Shutdown & Recovery Activities (← links)
- PNO-II-85-116, on 851211,facility Shut Down to Repair Steam Generator Tube Leak & Correct Low Oil Level in Reactor Coolant Pump.Caused by Low Level Indication on Reactor Coolant Pump.Restart of Unit Scheduled for 851226 (← links)
- PNO-II-85-067, on 850712,main Generator Trip & Reactor Trip Occurred.Caused by Damaged Permanent Magnet Generator. Permanent Magnet Generator Being Replaced & Main Generator Bearings Being Evaluated.Plant to Be Restarted on 850723 (← links)
- PNO-II-86-008, on 860123,declared Unusual Event & Began Controlled Shutdown of Plant,Unit 2,due to Computer Calculation of Reactor Coolant Sys Identification Leak 1.5 Gpm (← links)
- PNO-II-89-063 (redirect page) (← links)
- PNO-II-89-063, A:on 890906,Augmented Insp Team Dispatched to Investigate Overpressurization of Containment Spray Sys & Resultant Spill of Contaminated Water Into Auxiliary Bldg. Problems Existed W/Operability Test Procedure (redirect page) (← links)
- PNO-II-87-044, augmented Insp Team Dispatched to Investigate Failure of Westinghouse Model DS416 Breaker Which Failed to Open Even Through Control Room Indicators Indicated Open. Breaker Manually Opened at Breaker Cabinet (← links)
- PNO-II-89-063A, on 890906,Augmented Insp Team Dispatched to Investigate Overpressurization of Containment Spray Sys & Resultant Spill of Contaminated Water Into Auxiliary Bldg. Problems Existed W/Operability Test Procedure (← links)
- ML20247D371 (redirect page) (← links)