Pages that link to "NUREG-1482, Revision 3, Guidelines for Inservice Testing at Nuclear Power Plants: Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants"
Jump to navigation
Jump to search
The following pages link to NUREG-1482, Revision 3, Guidelines for Inservice Testing at Nuclear Power Plants: Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants:
Displayed 2 items.
- NUREG-1482, 1-NUREG-1482 Rev-3 Comments Resolution May 25 -2020 (Finai) .Doc (redirect page) (← links)
- NUREG-1482, Discussion of the Draft Report NUREG-1482, Revision 3 (redirect page) (← links)
- Office of Nuclear Reactor Regulation (← links)
- ML19312A037 (redirect page) (← links)
- ML20153A761 (redirect page) (← links)
- NUREG-1482, Discussion of the Draft Report NUREG-1482, Revision 3 (redirect page) (← links)
- ML20202A473 (redirect page) (← links)
- ML20330A185 (← links)
- ML21181A057 (← links)
- ML22077A841 (← links)
- ML22118A077 (← links)
- ML21267A091 (← links)
- RS-23-034, Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program (← links)
- Information Notice 2021-01, Lessons Learned from U.S. Nuclear Regulatory Commission Inspections of Design-Basis Capability of Power-Operated Valves at Nuclear Power Plants (← links)
- ML23072A435 (← links)
- ML23256A171 (← links)
- ML23361A104 (← links)