Pages that link to "NRC-87-0095"
Jump to navigation
Jump to search
The following pages link to NRC-87-0095:
Displayed 3 items.
- NRC-88-0187, Forwards Detailed Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings & Confirmation of Test Results (← links)
- NRC-87-0095, Forwards Addl Response to Remaining Actions Identified in IE Bulletin 85-003 & Clarifies Info from Insp Rept 50-341/87-35.Design Testing for Operation of 17 HPCI & 16 RCIC Sys Valves Performed (← links)
- NRC-88-0084, Deletes Commitment Made in to Change Actuator on RCIC Valve F012,in Response to IE Bulletin 85-003.Design Change to RCIC Sys Will Be Implemented During Local Leak Rate Test Outage to Remove Power to RCIC Valve F012 (← links)