Pages that link to "L-PI-16-030, Transmittal of 2015 180-Day Steam Generator Tube Inspection Report"
Jump to navigation
Jump to search
The following pages link to L-PI-16-030, Transmittal of 2015 180-Day Steam Generator Tube Inspection Report:
Displayed 50 items.
- ML17046A659 (← links)
- ML16141B250 (redirect page) (← links)
- ML072780026 (← links)
- ML062770195 (← links)
- ML19018A204 (← links)
- L-PI-11-087, Lnservice Inspection Summary Report, Interval 4, Period 2, Outage 2 Refueling Outage Dates: 04-29-2011 to 06-11-2011 Unit 1, Fuel Cycle 26: 11-23-2009 to 06-11-2011 (← links)
- L-PI-10-099, Unit 2 180-Day Steam Generator Tube Inspection Report (← links)
- L-PI-10-083, Inservice Inspection Summary Report, Interval 4, Period 2, Outage 2, Refueling Outage Dates: 04-16-2010 to 05-24-2010 Unit 2, Fuel Cycle 25: 11-02-2008 to 05-24-2010 (← links)
- L-PI-10-051, Revision to Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006 Fuel Cycle 23: 11-23-2004 to 06-06-2006 and Revision to 2008 Unit 1 180-Day Steam Generator Tube Inspection Report (← links)
- L-PI-10-013, Inservice Inspection Summary Report, Interval 4, Period 2, Outage 1, Refueling Outage Dates: 09-12-2009 to 11-23-2009, Unit 1, Fuel Cycle 25: 03-23-2008 to 11-23-2009 (← links)
- ML19108A291 (← links)
- L-PI-18-003, Inservice Inspection Summary Report Unit 2, Refueling Outage Dates: 10/13/2017 to 11/20/2017, Fuel Cycle 29: 12/07/2015 to 11/20/2017 (← links)
- L-PI-16-030 (redirect page) (← links)
- L-PI-16-013, Inservice Inspection Summary Report Refueling Outage Dates: 10/17/2015 to 12/06/2015, Fuel Cycle 28: 01/05/2014 to 12/06/2015 (← links)
- L-PI-15-025, Inservice Inspection Summary Report Unit 1, Interval 4, Period 3, Outage 2 - Refueling Outage Dates: 10/08/2014 to 11/22/2014, Fuel Cycle 28: 01/03/2013 to 11/22/2014 (← links)
- L-PI-15-016, Supplement to 10 CFR 50.55a Requests (RR) 1-RR-4-9 and 2-RR-4-9 (TACs MF4795 and MF4796) Associated with Prairie Island Nuclear Generating Plant (PINGP) Fourth Ten-Year Interval Inservice Inspection (ISI) Program (← links)
- L-PI-15-013, Supplement to 10 CFR 50.55a Requests (RR) 1-RR-5-5 and 2-RR-5-5 (TACs MF4839 and MF4840) Associated with Prairie Island Nuclear Generating Plant (PINGP) Fifth Ten-Year Interval Inservice Inspection (ISI) Program (← links)
- L-PI-14-127, Fifth Interval Inservice Inspection Plan December 21, 2014 Through December 20, 2024 (← links)
- L-PI-14-117, Withdrawal of 10 CFR 50.55a Request RR-01 Associated with the Fifth Ten-Year Interval for the Inservice Test Program (TAC Nos. MF3928 and Mf 3929) (← links)
- L-PI-14-096, Supplement to 10 CFR 50.55a Requests RR-01, RR-03, RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Inservice Test Program (← links)
- L-PI-14-095, 10 CFR 50.55a Requests 1-RR-5-7 and 2-RR-5-7 Associated with the Fifth Ten-Year Interval for the Lnservice Inspection Program (← links)
- L-PI-14-085, 10CFR 50.55a Requests Associated with the Fifth Ten-Year Interval for the Inservice Inspection Program (← links)
- L-PI-14-080, 10 CFR 50.55a Requests 1-RR-4-9, 2-RR-4-9 and 2-RR-4-10 Associated with the Fourth Ten-Year Interval for the Inservice Inspection Program (← links)
- L-PI-14-015, 10 CFR 50.55a Requests RR-01, RR-03. RR-05, RR-06 and RR-07 Associated with the Fifth Ten-Year Interval for the Lnservice Test Program (← links)
- L-PI-14-029, Lnservice Inspection Summary Report Unit 2. Interval 4, Period 3, Outage 2, Refueling Outage Dates: 09/21/2013 to 01/04/2014, Fuel Cycle 27: 05/29/2012 to 01/04/2014 (← links)
- L-PI-13-089, Supplement to Aging Management Program Submittals (← links)
- L-PI-13-027, Inservice Inspection Summary Report, Interval 4, Period 3, Outage 1, Refueling Outage Dates: 10-23-2012 to 01-02-2013 Unit 1, Fuel Cycle 27: 06-12-2011 to 01-02-2013 (← links)
- L-PI-12-077, Inservice Inspection Summary Report, Interval 4, Period 3, Outage 1, Refueling Outage Dates: 02-21-2012 to 05-29-2012 U2, Fuel Cycle 26: 05-26-2010 to 05-29-2012 (← links)
- L-PI-09-015, Submittal of Inservice Inspection Examination Summary Report, Interval 4, Period 2, Outage 1, Refueling Outage, Dates: 09-19-2008 to 11-01-2008 Unit 2, Fuel Cycle 24:12-15-2006 to 11-01-2008 (← links)
- L-PI-08-082, Amendment to Unit 2 Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2, Refueling Outage Dates: 11-15-2006 to 12-15-2006, Fuel Cycle 23: 06-11-2005 to 12-15-2006 (← links)
- L-PI-08-055, Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2 Refueling Outage Dates: 02-13-2008 to 03-23-2008, Fuel Cycle 24: 06-06-2006 to 03-23-2008 (← links)
- L-PI-07-037, 10 CFR 50.55a Request 1-RR-4-6 for the Prairie Island, Unit 1, Fourth Ten-year Interval Inservice Inspection Program (← links)
- L-PI-07-023, Inservice Inspection Summary Report, Interval 4, Period 1, Outage 2, Refueling Outage Dates: 11-15-2006 to 12-15-2006, Fuel Cycle 23: 06-11-2005 to 12-15-2006 (← links)
- L-PI-06-102, Unit 2 Steam Generator Inspection Results - 15 Day Report (← links)
- L-PI-06-096, CFR 50.55a Requests 1-RR-4-7 and 2-RR-4-7 for the Units 1 and 2 Fourth 10-Year Interval Inservice Inspection Program (← links)
- L-PI-06-072, Inservice Inspection Summary Report, Interval 4, Period 1, Refueling Outage Dates: 04-28-2006 to 06-06-2006, Fuel Cycle 23: 11-23-2004 to 06-06-2006 (← links)
- L-PI-04-135, Inservice Inspection Summary Report, Interval 3, Period 3, Interval 4, Period 1 Refueling Outage Dates: April 16, 2005 - June 10, 2005, Fuel Cycle 22: October 11, 2003 - June 10, 2005 (← links)
- L-PI-05-082, Request for Relief No. 21, for the Plant 3rd 10-Year Interval Inservice Inspection Program (← links)
- L-PI-05-074, Response to Request for Additional Information Regarding the Unit 1 Lnservice Lnspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-10-2004 to 11-23-2004 Fuel Cycle 22.. (← links)
- L-PI-05-013, Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates 09-10-04 Fuel Cycle 22: 12-7-2002 to 11-23-04 (← links)
- L-PI-05-012, Request for Relief No. 17, Revision 0, for the Plant 3rd 10-year Interval Inservice Inspection Program (← links)
- L-PI-05-002, 60-Day Report Pursuant to NRC Bulletin 2003-02 for 2004 Prairie Island Unit 1 Lower Head Penetration Inspection (← links)
- ML20009F331 (← links)
- L-PI-04-009, Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates: 9-13-2003 to 10-10-2003 Fuel Cycle 21: 3-3-2002 to 10-10-2003 (← links)
- L-PI-04-005, Request for Relief No. 16, Revision 0 for the Third 10-Year Interval Inservice Inspection Program (← links)
- L-PI-03-035, Relief Request to Perform a Visual Examination in Lieu of Volumetric Examination of Reactor Vessel Nozzle Inner Radius Sections Per Code Case N-648-1 (← links)
- ML030900342 (← links)
- L-PI-03-025, Relief Request to Use VT-1 Visual Examination in Lieu of Surface Examination of Reactor Vessel Head Closure Nuts (← links)
- L-PI-03-029, Inservice Inspection Summary Report, Interval 3, Period 3, Refueling Outage Dates:11-15-2002 to 12-6-2002 Fuel Cycle 21: 2-25-2001 to 12-6-02, Items 1-18-010 - I-19-1006 (← links)
- ML021580448 (← links)