Pages that link to "L-21-040, Annual Notification of Property Insurance Coverage"
Jump to navigation
Jump to search
The following pages link to L-21-040, Annual Notification of Property Insurance Coverage:
Displayed 50 items.
- ML112380028 (← links)
- ML112380025 (← links)
- ML112371790 (← links)
- ML112351286 (← links)
- ML112351099 (← links)
- ML112351092 (← links)
- ML110980097 (← links)
- ML090920317 (← links)
- ML070940682 (← links)
- ML070890123 (← links)
- L-16-366, LER 16-03-001 for Perry Nuclear Power Plant Loss of Safety Related Electrical Bus Results in a Loss of Shutdown Cooling (← links)
- L-16-365, LER 16-01-001 for Perry, Unit 1, Regarding Pressure Boundary Leakage, Level 8 Automatic SCRAM, and APRM Loss of Safety Function (← links)
- L-15-166, Supplemental Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, Reactor Vessel Internals Inspection Plan (TAC No. ME4640) and License Renewal Application Amendment No. 56 (← links)
- L-14-396, 2015 Perry Nuclear Station, Initial License Exam, Letter from Licensee Submitting Proposed Exam (← links)
- L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55 (← links)
- L-15-034, Water Withdrawal Report for the Davis-Besse Nuclear Power Station, Unit 1, for 2014 (← links)
- L-15-074, FENOC, Perry Nuclear Power Plant - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi Ac (← links)
- L-14-297, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 53 (← links)
- L-13-194, LER 13-S02-01 for Perry, Unit 1 Regarding Security Weapon Left Unattended (← links)
- L-13-180, Supplemental Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment 42 (← links)
- L-13-143, LER 13-S02-00, for Perry Nuclear Power Plant, Unit 1, Regarding Security Weapon Left Unattended (← links)
- L-13-119, LER 13-S01-00 for Perry Nuclear Power Plant, Unit 1, Regarding Local Power Range Monitors Delivered to the Incorrect Address (← links)
- L-12-335, Supplemental Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 34 (← links)
- L-12-315, Supplemental Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC ME4640) and License Renewal Application Amendment No. 32 (← links)
- L-12-284, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC ME4640) and License Renewal Application Amendment No. 31 (← links)
- L-12-243, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 28 (← links)
- L-12-114, LER 12-S02-00, for Perry Nuclear Power Plant, Unit 1, Regarding Potential Vulnerability in a Safeguards Security System (← links)
- L-12-083, LER 12-S01-00, Latent Software Error Resulted in Improperly Authorized Visitor Access Into Protected Area (← links)
- L-12-029, Closure of Perry Nuclear Power Plant NOV Incident Number 1110-43-3373 (← links)
- L-11-301, Ltr 11/7/2011 from FENOC to M. Satorius Davis-Besse Completion of Actions Required by Confirmatory Action Letter 3-10-001 (← links)
- L-11-359, Response to Request for Additional Information on 10 CFR 50-355a Request RR-A35, Proposed Alternative to System Leakage Test Requirements (← links)
- L-11-353, Documentation of Commitments for the Davis-Besse Nuclear Power Station, Unit 1 (← links)
- L-11-307, Ltr 10/19/11 Davis-Besse Re Experience Requirement Waiver Request for Licensed Operator Applicant (← links)
- L-11-292, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640). License Renewal Application Amendment No. 19, and Revised License Renewal Applica (← links)
- L-11-267, Response to Request for Additional Information Related to the 10 CFR 50.55a Requests in Support of the Third 10-Year Inservice Inspection Interval (← links)
- L-11-218, Reply to Requests for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 12 (← links)
- L-10-324, Ohio EPA Incident No. 1010-43-2695, National Response Center Incident No. 958358 and 958362, Perry Nuclear Power Plant (← links)
- L-10-263, Notification Letter Designating Davis-Besse Nuclear Power Station Balance of Plant Systems within the Cyber Security Rule Scope (← links)
- L-02-002, G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse (← links)
- L-10-067, Beaver, Units 1 & 2, Perry, Unit 1, Request for NRC Consent to Extinguish Parental Guaranty (← links)
- L-09-164, Supplemental Information for the Perry Nuclear Power Plant Decommissioning Funding Report (← links)
- L-09-033, FENOC, EA-03-214, Completion of Actions Required by Confirmatory Order for Davis-Besse Power Station (← links)
- L-09-094, Transmittal of Perry Nuclear Power Plant, Annual Environmental and Effluent Release Report for Period of January 1, 2008 Through December 31, 2008 (← links)
- L-08-193, Firstenergy Nuclear Operating Company - Davis Besse Letter to J. Caldwell Re Submittal of Organization Safety Culture and Safety Conscious Work Environment Independent Assessment Plan (← links)
- L-08-052, LER 07-04-001 for Perry Nuclear Power Plant Re Automatic Reactor Protection System Actuation Due to Feedwater Control Power Supply Failure (← links)
- L-08-040, Letter to J. Caldwell Dated 02/12/2008 Regarding Submittal of the Operations Performance Independent Assessment Plan for the Davis-Besse Nuclear Power Station - Year 2008 (← links)
- L-08-005, Submittal of the 2007 Organizational Safety Culture and Safety Conscious Work Environment Independent Assessment Report for Davis-Besse (← links)
- L-18-189, Readiness for Nrg Supplemental Inspection Required for a White Finding (← links)
- L-18-198, Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report (← links)
- L-18-090, Occupational Radiation Exposure Report Tot Year 2017 (← links)