Pages that link to "B10536, Advises That Positive Results of Control Element Assembly Guide Tube Insps & Insps at End of Cycles 2 & 3 Demonstrate That Sleeves Are Adequate Resolution to Guide Tube Wear Problem.Further Insp Superfluous"
Jump to navigation
Jump to search
The following pages link to B10536, Advises That Positive Results of Control Element Assembly Guide Tube Insps & Insps at End of Cycles 2 & 3 Demonstrate That Sleeves Are Adequate Resolution to Guide Tube Wear Problem.Further Insp Superfluous:
Displayed 4 items.
- ML20071K624 (redirect page) (← links)
- B10536 (redirect page) (← links)
- B10698, Forwards Addl Info Re Measurement Uncertainties Per NRC .Process Equipment Installed During Cycle 4/5 Refueling Outage Provided Excellent Operating Characteristics of Modified Channels W/Minimal Drift (← links)
- B10638, Advises That Extra Time Needed to Respond to Question 4 of NRC Re Measurement Uncertainties Used in Safety Analyses,Since Final Designs for Several Measurement Channels Not Yet Finalized (← links)