Pages that link to "1CAN118604, Discusses Results of Volumetric Exam of Reactor Coolant Pump a Welds as Required by First 10-yr Inservice Insp Program. Analysis Shows Pump Casing to Be Structurally Sound W/Flaw Present.Calculation Repts Encl"
Jump to navigation
Jump to search
The following pages link to 1CAN118604, Discusses Results of Volumetric Exam of Reactor Coolant Pump a Welds as Required by First 10-yr Inservice Insp Program. Analysis Shows Pump Casing to Be Structurally Sound W/Flaw Present.Calculation Repts Encl:
Displayed 5 items.
- ML20213F479 (← links)
- ML20213F473 (← links)
- ML20213F461 (redirect page) (← links)
- 1CAN118610, Requests Relief from Requirement for Volumetric Exam of Reactor Coolant Pump (RCP) Flaw Indications,As Part of First 10-yr Inservice Insp Program.Exam of RCP a Showed No Growth in Flaw Length Over 12 Yrs of Operation.Analyses Encl (← links)
- 1CAN118604 (redirect page) (← links)
- 1CAN118610, Requests Relief from Requirement for Volumetric Exam of Reactor Coolant Pump (RCP) Flaw Indications,As Part of First 10-yr Inservice Insp Program.Exam of RCP a Showed No Growth in Flaw Length Over 12 Yrs of Operation.Analyses Encl (← links)
- 1CAN118604, Discusses Results of Volumetric Exam of Reactor Coolant Pump a Welds as Required by First 10-yr Inservice Insp Program. Analysis Shows Pump Casing to Be Structurally Sound W/Flaw Present.Calculation Repts Encl (← links)