Pages that link to "05000341/LER-1997-014, Forwards LER 97-014-01 Which Addresses Issues Identified as Result of Investigation of Unsealed Penetrations in Auxiliary Bldg.Commitments Made in LER Listed"
Jump to navigation
Jump to search
The following pages link to 05000341/LER-1997-014, Forwards LER 97-014-01 Which Addresses Issues Identified as Result of Investigation of Unsealed Penetrations in Auxiliary Bldg.Commitments Made in LER Listed:
Displayed 13 items.
- 05000341/LER-1997-007, Forwards LER 97-007-00,re Failure of Reactor Building Ventilation Sys Resulting in Loss of Secondary Containment Integrity During Shutdown Conditions.W/Listed Commitments (← links)
- 05000341/LER-1997-002, Forwards LER 97-002 Documenting Failure of HPCI Pump Discharge Valve to Open Upon Manual Demand Signal,During SD Conditions.Util Commitment Is to Evaluate SR & Balance of Plant Valves from Overall Plant Risk Perspective (← links)
- 05000341/LER-1997-001, Forwards LER 97-001-00 Re an Error in Mass Flow Conversion Algorithm in Heat Balance Methodology for Calculating Core Thermal Power.Util Commitments Made within Ltr (← links)
- 05000341/LER-1997-009, Forwards LER 97-009-00 Re Failure to Inspect Control Rod Drive Housing Support Structure Following Maint in Housing Support Area,Per 10CFR50.73.Commitments Made within Ltr, Listed (← links)
- 05000341/LER-1997-012, Forwards LER 97-012-00,documenting Issues Identified in Performance of Surveillance Testing for Reactor Recirculation Sys Motor Generator Set Mechanical & Electrical Stops.Testing Considered Adequate (← links)
- 05000341/LER-1997-008, Forwards LER 97-008-00 Re Potential Common Mode Failure Mechanism That Existed w/480 Volt MCC Fused Disconnect Switches (← links)
- 05000341/LER-1997-005, Forwards Rev 1 to LER 97-005 Re Inadequate Design or Consideration of Circuits Involved in Achieving Dedicated Shutdown (← links)
- 05000341/LER-1997-003, Forwards LER 97-003-01,which Documents Condition Outside Design Basis Related to EECW Sys Containment Isolation Function.Diverse Power Mod of Eecs Sys Primary Containment Penetrations Have Been Completed (← links)
- 05000341/LER-1997-011, Forwards LER 97-011,documenting Late Performance of Turbine Stop Valve Closure & Turbine Control Fast Closure Channel Functional Tests.Commitments Made Listed (← links)
- 05000341/LER-1997-004, Forwards LER 97-004-01 Re Calibration of Primary Containment Oxygen Monitor in de-inerted Environment Challenging Operability of Monitor in Inerted Environment (← links)
- 05000341/LER-1997-014 (redirect page) (← links)
- 05000341/LER-1997-006, Forwards LER 97-006-01,re Response Time Testing Not Being Conducted IAW Ts.Rev Provides Revised Dates of non- Compliance Found During Review Being Conducted for Extension of Surveillance Intervals for Current Cycle 6 (← links)
- ML20216B813 (redirect page) (← links)