Pages that link to "05000341/LER-1990-012, :on 901016,HPCI Steam Line Flow Transmitter Failure Occurred"
Jump to navigation
Jump to search
The following pages link to 05000341/LER-1990-012, :on 901016,HPCI Steam Line Flow Transmitter Failure Occurred:
Displayed 4 items.
- ML20062E945 (redirect page) (← links)
- 05000341/LER-1990-012 (redirect page) (← links)
- 05000341/LER-1990-001, :on 900108,blown Fuse in Testability Cabinet H21-P083 Caused Entry Into Tech Spec 3.0.3 (← links)
- 05000341/LER-1990-012, :on 901016,HPIC Steam Line Flow Transmitter Failed Due to Short Circuit Across Capacitor Plates.Circuit Boards Replaced & Failure Analysis Performed by Rosemount,Inc (redirect page) (← links)
- NRC-91-0069, LER 90-012-01:on 901016,HPIC Steam Line Flow Transmitter Failed Due to Short Circuit Across Capacitor Plates.Circuit Boards Replaced & Failure Analysis Performed by Rosemount,Inc.W/910524 Ltr (redirect page) (← links)
- ML20024H225 (redirect page) (← links)
- 05000341/LER-1990-013, :on 901228,determined That Need for Isolation of Sampling Line in Event of LOCA Not Identified in Procedure & Primary Containment Integrity Could Be Compromised.New Sample Taps Added (← links)
- 05000341/LER-1990-011, :on 901006,reactor Scram Occurred Due to Reactor Water Level Discrepancy (← links)
- 05000341/LER-1990-008, :on 900905,HPCI Inadvertant Isolation Occurred. Caused by Spurious High Steam Flow Signal on One of Two Channels.Engineering Design Change Implemented to Filter Out Existing Background Noise from Output (← links)
- 05000341/LER-1990-010, :on 900718,during Performance of Surveillance 24.137.001, Main Steam Line Isolation Channel Functional Test, Operator Incorrectly Depressed Close Pushbutton Instead of Test Pushbutton,As Required (← links)
- 05000341/LER-1990-009, :on 901002,determined That Loss of Shutdown Cooling & Safety Features Actuation Due to Breaker Tripping (← links)
- 05000341/LER-1990-002, :on 900202,determined That Area Radiation Surveillance Procedure 44.080.301 Listed Incorrect Values for Alarm Setpoints.Caused by Unavailable Setpoint Calculations.Procedure Revised (← links)
- 05000341/LER-1990-004, :on 900404,RHR Sys Small Bore Connections Calculated to Experience Stress Above ASME Code III 1971 Code Requirements.Caused by Vibration Related Concerns.Welds Modified (← links)
- 05000341/LER-1990-007, :on 900829,control Ctr Ventilation Shifted to Recirculation Due to Blown Fuse.Caused by Design Deficiency in Div 1 & 2 Radiation Monitor Trip Circuitry.Design Change Implemented to Eliminate Trip Relay Logic (← links)