Pages that link to "05000335/LER-2076-007, For St. Lucie Unit 1, an Error in the RCS Loop Temperature Wiring Diagrams"
Jump to navigation
Jump to search
The following pages link to 05000335/LER-2076-007, For St. Lucie Unit 1, an Error in the RCS Loop Temperature Wiring Diagrams:
Displayed 46 items.
- ML18110A608 (redirect page) (← links)
- 05000335/LER-2076-011, Steam Driven Auxiliary Feedwater Pump (← links)
- 05000335/LER-2076-043-01, Missing Standpipes in Steam Generator a Feed Ring (← links)
- 05000335/LER-2076-046, Inoperable Door Operating Mechanism in Containment Personnel Air Lock Outer Door (← links)
- 05000335/LER-2076-009, Five Mechanical Piping Restraints Were Locked Up During Heatup for Post Core Hot Functional Testing (← links)
- 05000335/LER-2076-012, During Preoperational Testing, Main Steam Isolation Valves Did Not Close within 6 Seconds as Required by Tech Spec 4.7.1.5.b (← links)
- 05000335/LER-2076-013, During Preoperational Testing, Steam Auxiliary Feed Pump Would Not Start Properly from Hot Shutdown Control Panel (← links)
- 05000335/LER-2076-014, During Preoperational Testing, Outer Personnel Access Door to Containment Would Not Pass Air Leakage Test (← links)
- 05000335/LER-2076-016, During Preoperational Testing with Plant in Hot Standby, Control Room Air Conditioner Was Out of Service (← links)
- 05000335/LER-2076-017, During Surveillance Test, Four Bistables Were Drifted Such That Their Trip Setpoints Were Less Conservative than Required by Tech Spec 3.3.2.1 (← links)
- 05000335/LER-2076-018, During Performance of Control Element Assembly Calibration Preoperational Test, RCS Boron Concentration Was Diluted and Group I Was Inserted to Match Reactivity (← links)
- 05000335/LER-2076-019, During Testing, Digital Data Processor Malfunctioned; Resulted in Loss of CEA Pulse Counting Position Indication (← links)
- 05000335/LER-2076-020, During Power Ascension to Twenty Percent Plateau, Power Dependent Insertion Limit Was Changing in Non-Conservative Direction as Power Increased (← links)
- 05000335/LER-2076-023, During Surveillance Test on Hot Shutdown Control Panel, Cold Leg Temperature Indication for Reactor Coolant Loop 1A1 Was Not Correct (← links)
- 05000335/LER-2076-021, A Diesel Generator Was Tested to Verify Operability When One of the Air Start System Solenoid Valves and Its Associated Air Line Were Clogged with Dirt (← links)
- 05000335/LER-2076-028, Review of the Testing Proposed for Unit 2 Hydrogen Sampling System Isolation Valves Led to Examination of Purchase Order for the Identical Unit 1 Valves (← links)
- 05000335/LER-2076-024, During Preoperational Testing, Remotely Operated Containment Isolation Valve (Primary Makeup Water) Would Not Close Automatically (← links)
- 05000335/LER-2076-025, During Preoperational Testing, Regulating Rod 59 Was Immovable Because Associated CEA Module Had Malfunctioned (← links)
- 05000335/LER-2076-026, During Power Ascension Testing, One of Four Redundant 120 Volt Ac Instrument Power Busses Was Lost Due to Malfunction of 1C Static Inverter (← links)
- 05000335/LER-2076-027, During Power Ascension Testing, Digital Data Processor Malfunctioned; Resulted in Loss of CEA Pulse Counting Position Indication (← links)
- 05000335/LER-2076-029, Contrary to Tech Spec 4.3.3.3.1, Required Channel Check of 2 Triaxial Accelerographs Was Not Performed within Required Time Frame (← links)
- 05000335/LER-2076-030, During Plant Startup/Heatup from Cold Iron Shutdown Conditions, Plant Experienced Over-Pressure Transient When First RCP Was Started (← links)
- 05000335/LER-2076-032, Relief Valve in Boric Acid Make-Up System Developed a Leak (← links)
- 05000335/LER-2076-035, During Power Ascension Testing, It Was Determined That Power Distribution in Core Was Not as Predicted for 80 Percent Power (← links)
- 05000335/LER-2076-033, While Pumping Water from Primary Water Tank to Spent Fuel Pool, Operations Personnel Found Refueling Water Tank Was Overflowing (← links)
- 05000335/LER-2076-034, In Order to Compensate for Errors Found in NSSS Vendors Strikin II Computer Code, Several Instrumentation and Control Setpoints Were Adjusted (← links)
- 05000335/LER-2076-036, Steam Driven Auxiliary Feedwater Pump Would Not Start Because Steam Supply Valve Would Not Open Fully (← links)
- 05000335/LER-2076-037, With Reactor Critical at 0.01 Percent Power, Control Element Assembly 50 Dropped (← links)
- 05000335/LER-2076-038, With Reactor Critical at 0.01 Percent Power, Power Supply to Digital Data Processor Was Momentarily Deenergized (← links)
- 05000335/LER-2076-039, With Reactor Critical at 0.01 Percent Power, Shield Building Access Door Was Found Open Which Is Contrary to Technical Specification 3.6.6.2 (← links)
- 05000335/LER-2076-040, During Reactor Shutdown and Cooldown, Pressurizer Level Would Drop Whenever Either Set of Shutdown Cooling System Suction Valves Was Opened (← links)
- 05000335/LER-2076-041, During Shutdown Cooling Pump Operation, Second Charging Pump Was Started to Increase Letdown Flow Rate and It Caused Reactor Coolant System Pressure to Increase (← links)
- 05000335/LER-2076-043, During Special Inspection of Steam Generators a and B to Accomplish Tack Welding of Stand Pipes for Feed Ring, 3 Stand Pipes Were Found Missing (← links)
- 05000335/LER-2076-042, With Reactor Shutdown for Fuel Inspection, Containment Purge Fan Was Started and Sufficient Vacuum Was Obtained to Cause Containment Vacuum Release Valve to Open (← links)
- 05000335/LER-2076-044, With 1B Diesel Generator Out of Service for Preventive Maintenance on Air Line Lubricators, 1A Diesel Generator Failed to Start During Surveillance Test (← links)
- 05000335/LER-2076-045, During Plant Heatup, Low Pressure Safety Injection Pumps Were Stopped When System Pressure Had Been Raised Above 250 Psia (← links)
- 05000335/LER-2076-047, Steam Driven Auxiliary Feedwater Pump Would Not Start Because Trip Solenoid Latch Failed to Engage (← links)
- 05000335/LER-2076-048, Due to Faulty Switch on Operators Console an Interrupt Signal Was Sent to Central Processing Unit Causing Digital Data Processor to Halt (← links)
- 05000335/LER-2076-003, For St. Lucie Unit 1, a Design Error in Engineered Safety Features Actuation System (← links)
- 05000335/LER-2076-001, For St. Lucie Unit 1, a Breach of Containment Integrity (← links)
- 05000335/LER-2076-002, For St. Lucie Unit 1, Spent Fuel Crane Overload Interlock-Setpoint Drift (← links)
- 05000335/LER-2076-004, For Saint Lucie Unit 1, a Breach of Containment Integrity (← links)
- 05000335/LER-2076-005, For St. Lucie Unit 1, Two Inoperable Containment Area Radiation Monitoring Instrumentation Channels (← links)
- 05000335/LER-2076-006, For St. Lucie Unit 1, Technical Specification Time Limit Exceeded During Transition from Shutdown Cooling Pumps to Reactor Coolant Pumps (← links)
- 05000335/LER-2076-007 (redirect page) (← links)
- ML18110A477 (redirect page) (← links)
- 05000335/LER-2076-008, For St. Lucie Unit 1, Two Female Unions Improperly Welded Into the Cooling Lines for LPSI Pumps 1A and 1B (← links)