- 05000334/LER-1998-015, Forwards LER 98-015-01, Inadequate Performance of Channel Functional Tests, Per 10CFR50.73(a)(2)(i).Restatement of Corrective Action Provided with Underlined Words to Clarify Intent (← links)
- 05000334/LER-1998-007, Informs That Commitment to Revise Maint Sps as Stated in LER 98-007 Is Being Revised to 990215.Maint Sps 1MSP-36.22-M,1MSP-36.36-M,1MSP-36.73-M & 1MSP-36.74-M & Date of Next Bvps,Unit 1 RFO,1R13,discussed (← links)
- 05000334/LER-1998-022, Informs That Commitment to Revise Maint Surveillance Procedures,As Stated in LER 98-022,is Being Revised to 990225.Change in Commitment Schedule Does Not Represent Challenge to Plant Safety (← links)
- ML20237C918 (redirect page) (← links)
- 05000334/LER-1998-014 (redirect page) (← links)
- 05000412/LER-1998-007, Forwards LER 98-007-02 Re Inadequate BVPS Unit 2 Procedures to Ensure Compliance W/Ts (← links)
- 05000334/LER-1998-026, Discusses Change in Commitment Contained in LER 98-026-00, Dtd 980723,re Stroke Testing & Operability Verification of Listed RHR & CCR Valves (← links)
- 05000412/LER-1998-008, Forwards LER 98-008-01, GL 96-01 TS Instrumentation Surveillance Inadequacies, Per 10CFR50.73(a)(2)(i) (← links)
- 05000412/LER-1998-010, Forwards LER 98-010-00, Non-Safety Related Mechanical Seal Assembly Installed in Quench Spray Pump 'A' 2QSS-P21A, Per 10CFR50.73(a)(2)(i) (← links)
- 05000334/LER-1998-027, Informs That Dl Intends to Issue Special Rept Providing Overview of TS Compliance Issues & Corrective Actions Taken. Based on Dl Intent to Provide Special Rept,Supplemental Rept to LER 98-027-00 Will Not Be Issued (← links)
- 05000334/LER-1998-020, Forwards LER 98-020-01, Use of Non-Calibr Computer Points for TS Surveillances, IAW 10CFR50.73(a)(2)(i) (← links)
- 05000412/LER-1998-011, Forwards LER 98-011-00, Cross-Connect Piping Installed Between Suction Lines of Hydrogen Recombiners, IAW 10CFR50.73(a)(2)(i) & (II) (← links)
- 05000334/LER-1998-002, Informs of Change in Scheduled Completion Date for Commitment Contained in LER 98-002-00.One of Seven Corrective Actions Can Not Be Completed on Schedule Originally Provided (← links)
- 05000412/LER-1998-002, Forwards LER 98-002-00,re Inadequate Testing of Diesel Fuel Oil Transfer Pumps as Required by TS (← links)
- 05000334/LER-1998-016, Forwards LER 98-016-00 Re Missing Fire/Flood Seal in Main Steam Valve Room Shakespace (← links)