Pages that link to "05000333/LER-1981-067, Forwards LER 81-067/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000333/LER-1981-067, Forwards LER 81-067/03L-0:
Displayed 24 items.
- 05000333/LER-1981-066-03, /03L-0:on 810816,during Startup,Heatup Rate Limit Was Exceeded.Caused by Personnel Error.Power Reduced & Steam Flow Increased (← links)
- 05000333/LER-1981-066, Forwards LER 81-066/03L-0 (← links)
- 05000333/LER-1981-068-03, /03L-0:on 810824,while Conducting Surveillance to Satisfy Tech Spec Table 4.2-2,HPCI High Steam Flow Differential Pressure Switch Was Found Set Above Tech Specs. Caused by Instrument Drift.Instrument Recalibr (← links)
- 05000333/LER-1981-067-03, /03L-0:on 810821,core Spray Permissive Pressure Switch 02-PS-52A Found Set at 436 Psig Instead of 450 Psig or Greater.Caused by Instrument Drift.Pressure Switch Adjusted to within Tech Spec Limits (← links)
- 05000333/LER-1981-067 (redirect page) (← links)
- 05000333/LER-1981-060-03, /03L-0:on 810810,safety Relief Valve Found Set at Different Setpoint than Allowed by Tech Spec.Caused by Personnel Error.Tech Spec Revised to Allow Interim Operation W/Valve of Different Setpoint (← links)
- 05000333/LER-1981-058-04, /04T-0:on 810729,environ Radiological Sampling Showed Abnormal Results in Fish & Poultry.Possibly Caused by Contamination Either During Field Collection or in Analytical Lab.Final Results Submitted in 1981 Rept (← links)
- 05000333/LER-1981-056-03, /03L-0:on 810708,drywell Floor Drain Sump Flow Integrator 20 FQ-527 Found Out of Procedural Tolerance. Caused by Instrument Drift.Intstrument Recalibr (← links)
- 05000333/LER-1981-056, Forwards LER 81-056/03L-0 (← links)
- 05000333/LER-1981-057, Forwards LER 81-057/03L-0 (← links)
- 05000333/LER-1981-052-03, /03L-0:on 810612,fire Protection Spray Nozzles for Standby Gas Treatment a Found Plugged W/Rust.Caused by Aging of Dry Pipe Spray Sys.Nozzles Cleaned & Returned to Svc (← links)
- 05000333/LER-1981-052, Forwards LER 81-052/03L-0 (← links)
- 05000333/LER-1981-065-03, /03L-0:on 810814,during Administrative Review Discovered That Some Surveillance Testing of Check Valves in Rhr,Core Spray,Hpci & Reactor Core Isolation Cooling Had Not Been Conducted.Caused by Procedural Error.Tests Performe (← links)
- 05000333/LER-1981-065, Forwards LER 81-065/03L-0 (← links)
- 05000333/LER-1981-062-04, /04T-0:on 810804,isolation Adjustment Potentiometer Malfunctioned,Possibly Allowing Isolation Setpoint & Actual Setpoint to Differ.Caused by Loose Set Screw Due to Wear & Tear.Set Screw Tightened (← links)
- 05000333/LER-1981-063, Forwards LER 81-063/03L-0 (← links)
- 05000333/LER-1981-061-01, /01T-0:on 810821,inspector Observed Containment Isolation Valves Associated W/Containment Atmosphere Gaseous & Particulate Monitoring Had Been Closed for Approx 22-h. Caused by Procedure Error,Failing to Direct Valve Opening (← links)
- 05000333/LER-1981-061, Forwards LER 81-061/01T-0 (← links)
- 05000333/LER-1981-059, Forwards LER 81-059/03L-0 (← links)
- 05000333/LER-1981-055-03, /03L-0:on 810701,during Normal Operation,While Conducting Table 4.2-1 Surveillance,Condenser Vacuum Switch 33-PS-135B Found Set Below Required Height,Cause Believed to Be Instrument Drift.Switch Immediately Adjusted (← links)
- 05000333/LER-1981-053-03, /03L-0:on 810625,mgt Review Revealed That Electric & Diesel Fire Pump Flow & Pressure Tests Per Tech Specs Were Not Conducted within Required Time Period.Caused by Failure to Place Surveillance Tests on Schedule.Tests Perfor (← links)
- 05000333/LER-1981-053, Forwards LER 81-053/03L-0 (← links)
- 05000333/LER-1981-054-03, /03L-0:on 810625,pressure Switch 02-3-PS-128A, Which Causes Isolation of Shutdown Cooling,Found Set Above Tech Spec Limit.Probably Caused by Instrument Drift.Switch Adjusted & Surveillance Frequency Increased (← links)
- 05000333/LER-1981-054, Forwards LER 81-054/03L-0 (← links)