Pages that link to "05000328/LER-1982-026, Forwards LER 82-026/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000328/LER-1982-026, Forwards LER 82-026/03L-0:
Displayed 35 items.
- 05000328/LER-1982-026-03, /03L-0:on 820221,containment Sump Level Transmitter 2-LT-65-176 Inoperable Due to High Readings. Caused by Leaking Sensor Bellows.Sensor Bellows Replaced & Transmitter Recalibr (← links)
- 05000328/LER-1982-026 (redirect page) (← links)
- 05000327/LER-1982-025-03, /03L-0:on 820212,pressurizer Level Channel 1-LT-68-335 Declared Inoperable.Caused by Transmitter Out of Calibr Due to Instrument Drift.Barton Model 764 Transmitter Recalibr (← links)
- 05000327/LER-1982-025, Forwards LER 82-025/03L-0 (← links)
- 05000327/LER-1982-027-01, /01T-0:on 820307,while Preparing to Perform SI-566,ERCW Flow Verification Test,Containment Spray Heat Exchanger 1A Found W/Low Essential Raw Cooling Water Flow. Caused by Fresh Water Clams in Piping.Clams Removed (← links)
- 05000327/LER-1982-027, Forwards LER 82-027/01T-0 (← links)
- 05000327/LER-1982-024-03, /03L-0:on 820218,turbine Bldg Sump & Condensate Demineralizer Radioactive Effluent Line Monitors Declared Inoperable.Caused by Crud & Debris Buildup on Flow Switch. Switches Cleaned (← links)
- 05000327/LER-1982-024, Forwards LER 82-024/03L-0 (← links)
- 05000327/LER-1982-028, Forwards LER 82-028/03L-0 (← links)
- 05000327/LER-1982-029-03, /03L-0:on 820215,w/unit in Mode 3,glycol Containment Isolation Valve 1-FCV-61-194 Would Not Reopen When Stroked from Full Open Position.Caused by Conductor G1B1 Not Being Terminated.Conductor Reterminated (← links)
- 05000328/LER-1982-022, Forwards LER 82-022/03L-0 (← links)
- 05000328/LER-1982-021-01, /01T-0:on 820217,during Startup,Shutdown Rods in Shutdown Bank a Exceeded Plus/Minus 12 Steps of Actual Position on Indicators.Caused by Misinterpretation of Limiting Condition for Operation 3.1.3.3.Rods Recalibr (← links)
- 05000328/LER-1982-021, Forwards LER 82-021/01T-0 (← links)
- 05000328/LER-1982-016-03, /03L-0:on 820127,steam Generator Pressure Channels for Loops 3 & 4 to Remote Shutdown Instrumentation Declared Inoperable Due to Failure to Meet Channel Check Requirements.Caused by Open Circuit on Loop 2-PI-1-19C (← links)
- 05000328/LER-1982-016, Forwards LER 82-016/03L-0 (← links)
- 05000327/LER-1982-017, Forwards LER 82-017/03L-0 (← links)
- 05000327/LER-1982-020-03, /03L-0:on 820203,emergency Gas Treatment Sys Room Cooler Declared Inoperable Due to Fuses Blowing in Coolers Control Circuitry.Caused by Shorted Solenoid Coil of 2-FSV-67-338.Coil Replaced (← links)
- 05000327/LER-1982-020, Forwards LER 82-020/03L-0 (← links)
- 05000327/LER-1982-070, Forwards LER 82-070/01T-0 (← links)
- 05000327/LER-1982-018, Forwards LER 82-018/03L-0 (← links)
- 05000328/LER-1982-013-03, /03L-0:on 820118,steam Generator 3 Feedwater Flow Transmitter Loop 2-FT-3-90A Declared Inoperable.Caused by Frozen Sense Lines.Lines Thawed & Insulation Added.Design Change Request Initiated (← links)
- 05000328/LER-1982-009-03, /03L-0:on 820111,in Mode 1 at 8% Rtp,Steam Generator Blowdown Containment Isolation valve,2-FCV-1-7, Operator Diaphragm Ruptured Rendering Valve Inoperable. Caused by Normal Wear.Diaphragm Replaced (← links)
- 05000328/LER-1982-004-03, /03L-0:on 820115,vital Battery Bank II Cell Temp Found to Be Less than 60 F,Rendering Sys Inoperable.Caused by Two Exhaust Fan Dampers Open Simultaneously.One Damper Closed & Room Heat Increased (← links)
- 05000328/LER-1982-004, Forwards LER 82-004/03L-0 (← links)
- 05000327/LER-1982-006-03, /03L-0:on 820115,turbine Driven Auxiliary Feedwater Pump Declared Inoperable Due to Failure to Meet Surveillance Requirements.Caused by Malfunction in Controller 1-FIC-46-57.Controller Replaced (← links)
- 05000327/LER-1982-008-03, /03L-0:on 820114,auxiliary Feedwater Level Control Valve 1-1CV-3-156 Would Not Operate While Attempting to Control Level on Steam Generator.Caused by Failure of Valve Position Controller.Controller Replaced (← links)
- 05000328/LER-1982-010, Forwards LER 82-010/03L-0 (← links)
- 05000328/LER-1982-001-03, /03L-0:on 820103,ice Condenser Intermediate Deck Door 9.B Discovered Frozen Shut.Caused by Humidity Entering Through Top Deck Blanket Vents,Condensed on I-beams & Dripping Onto Intermediate Deck Door.Ice Removed (← links)
- 05000327/LER-1982-145-03, /03L-0:on 821218,while in Mode 5,latch Mechanisms for Containment Ventilation Isolation Slave Relays Failed to Latch When Relay Energized.Cause Unknown.Equipment Removed & Replaced.Evaluation Continuing (← links)
- 05000327/LER-1982-140, Forwards LER 82-140/03L-0 (← links)
- 05000327/LER-1982-130, Forwards LER 82-130/03L-0 (← links)
- 05000328/LER-1982-127-03, /03L-0:on 821020,cooling Jacket Circulating Water Pump on Diesel Generator 2B-B Found Inoperable.Caused by Ball Bearing Failure.Pump Replaced (← links)
- 05000327/LER-1982-123, Forwards LER 82-123/01T-0 (← links)
- 05000328/LER-1982-109-03, /03L-0:on 820826,during Mode 1,hot Leg Sample Valve 2-FCV-43-22 Would Not Open.Caused by Open Limit Switch Being Out of Adjustment.Switch Adjusted,Valve Tested & Returned to Svc (← links)
- 05000328/LER-1982-109, Forwards LER 82-109/03L-0 (← links)