Pages that link to "05000269/LER-1981-010, Forwards LER 81-010/03L-0.Detailed Event Analysis Encl"
Jump to navigation
Jump to search
The following pages link to 05000269/LER-1981-010, Forwards LER 81-010/03L-0.Detailed Event Analysis Encl:
Displayed 29 items.
- ML20009F509 (redirect page) (← links)
- ML20009F510 (← links)
- 05000269/LER-1981-010-03, /03L-0:on 810602,turbine Driven Emergency Feedwater Pump Declared Inoperable.Caused by Governor Valve Sticking in Open Position Due to Sys Contamination.Linkage Pin Removed,Governor Valve Freed & Stem Cleaned (← links)
- 05000269/LER-1981-010, Forwards LER 81-010/03L-0.Detailed Event Analysis Encl (← links)
- 05000269/LER-1981-011, Forwards LER 81-011/01T-0.Detailed Event Analysis Encl (← links)
- 05000269/LER-1981-010 (redirect page) (← links)
- 05000269/LER-1981-013-01, /01T-0:on 810630,backup Function of Isolating & Transfer Diodes in Instrumentation & Control Sys Disabled on All Channels on All Units.Caused by Misinterpretation of Tech Specs.Proposed Tech Spec Change Initiated (← links)
- 05000269/LER-1981-013, Forwards LER 81-013/01T-0.Detailed Event Analysis Encl (← links)
- 05000287/LER-1981-003-01, /01T-0:on 810226,B Steam Generator Was Pressurized to 550 Psig.Caused by Procedural Deficiency. Once-through Steam Generator Pressure Lowered.Procedures for Opening Startup Block Valves Will Be Revised (← links)
- 05000287/LER-1981-003, Forwards LER 81-003/01T-0.Detailed Event Analysis Encl (← links)
- 05000270/LER-1981-009-03, /03L-0:on 810415,during Low Pressure Svc Water Pump Periodic Test,Valves 2LPSW-19 & 2LPSW-21 Were Closed Resulting in RB Rbcu Being Out of Svc.Caused by Personnel Error.Valve 2LPSW-19 Opened & Personnel Counseled (← links)
- 05000270/LER-1981-270, Forwards LER 81-270/03L-0.Detailed Event Analysis Encl (← links)
- 05000269/LER-1981-007, Forwards LER 81-007/01T-0.Detailed Event Analysis Encl (← links)
- 05000270/LER-1981-008-03, /03L-0:on 810508,solenoid Valve for 2FDW-316 Stuck in Manual Position,Disabling Automatic Level Control of B Steam Generator from Emergency Feedwater Sys.Valve Replaced Per Procedure (← links)
- 05000270/LER-1981-006-03, /03L-0:on 810409,valve 2PR-8 Failed to Open During on-line Insp.Caused by Faulty Valve Operator Diaphragm.Valve Repaired & Verified Operable (← links)
- 05000270/LER-1981-006, Forwards LER 81-006/03L-0.Detailed Event Analysis Encl (← links)
- 05000270/LER-1981-012-03, /03L-0:on 810506,turbine Driven Emergency Feedwater Pump Oil Sump Was Discovered Empty.Cause Unknown. Pump Control Switch Placed in Locked Out Position to Prevent Automatic Start of Pump.Oil Level Restored (← links)
- 05000270/LER-1981-012, Forwards LER 81-012/03L-0.Detailed Event Analysis Encl (← links)
- 05000270/LER-1981-008, Forwards LER 81-008/03L-0.Detailed Event Analysis Encl (← links)
- 05000270/LER-1981-005-01, /01T-0:on 810318,four Closure Studs on Reactor Coolant Pump 2A2 Had Corrosion Wastage in Pump Closure Area. Caused by Leakage from Pump Closure Gaskets.Stud 20 Replaced.Studs 1,2 & 3 Left in Place (← links)
- 05000270/LER-1981-005, Forwards LER 81-005/01T-0.Detailed Event Analysis Encl (← links)
- 05000287/LER-1981-010-03, /03L-0:on 810517,broken Airline to Valve 3LPSW-525 Was Discovered.Caused by Breakage of Brass Nipple Between Air Supply Isolation Valve & Accumulator Tank.Brass Nipple Replaced (← links)
- 05000287/LER-1981-010, Forwards LER 81-010/03L-0.Detailed Event Analysis Encl (← links)
- 05000269/LER-1981-008, Forwards LER 81-008/01T-0.Detailed Event Analysis Encl (← links)
- 05000270/LER-1981-001-03, /03X-1:on 810120,discovered That Low Pressure Svc Water Was Not Flowing to HPI Pump 2A.Caused by Blockage Due to Crud Buildup.Portions of Carbon Steel Piping Will Be Replaced W/Stainless Steel (← links)
- 05000270/LER-1981-001, Forwards LER 81-001/03X-1.Detailed Event Analysis Encl (← links)
- 05000287/LER-1981-011, Forwards LER 81-011/03L-0.Detailed Event Analysis Encl (← links)
- 05000287/LER-1981-009-03, /03L-0:on 810507,containment Isolation Valve 3CS-6 Was Discovered in Intermediate Position,Resulting in Loss of Containment Integrity.Cause Undetermined.Valve 3CS-6 Verified Operable (← links)
- 05000269/LER-1981-003, Forwards LER 81-003/03L-0.Detailed Event Analysis Encl (← links)
- 05000270/LER-1981-002-01, /01T-0:on 810211,electrical Penetration EMV-2 Could Not Be Pressurized.Caused by Leak at Interior Bushing. Penetration to Be Repaired or Replaced During Next Outage (← links)
- 05000270/LER-1981-004-03, /03L-0:on 810304,motor Driven Emergency Feedwater Pump 2B Was Declared Inoperable Due to Arcing in Motor.Cause Unknown.Motor Was Disassembled & Failure Found in Coil Slot (← links)
- 05000270/LER-1981-004, Forwards LER 81-004/03L-0.Detailed Event Analysis Encl (← links)