Pages that link to "05000260/LER-1981-027, Forwards LER 81-027/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000260/LER-1981-027, Forwards LER 81-027/03L-0:
Displayed 37 items.
- ML20009F999 (redirect page) (← links)
- 05000296/LER-1981-034, Forwards LER 81-034/03L-0 (← links)
- 05000260/LER-1981-035-03, /03L-0:on 810708,while Performing Level Switch Testing,Scram Discharge Instrument Vol Tank Level Switch 2-LS-85-45F Failed to Operate.Caused by Inoperable Robertshaw Level Switch Model SL-305-EI-X.Switch Replaced (← links)
- 05000260/LER-1981-032-03, /03L-0:on 810702,equipment Air Lock Door 238 Was Not Properly Latched Before Opposite Door Was Opened.Caused by Personnel Error.Personnel Instructed in Correct Operation of Doors (← links)
- 05000259/LER-1981-033, Forwards LER 81-033/03L-0.Supersedes (← links)
- 05000260/LER-1981-027-03, /03L-0:on 810604,during Mod Outage,Switch 2-PdIS-75-56 Was Found Outside Tech Spec Limits.Caused by Setpoint Drift of Barton Model 288 D/P Switch.Switch Recalibr (← links)
- 05000260/LER-1981-027 (redirect page) (← links)
- 05000296/LER-1981-028-03, /03L-0:on 810613,reactor Recirculation Pump 3-A Tripped Due to Motor Generator Set Tripping.Caused by 2A-K45A Relay Action Initiated by Resistance Temp Detector High Temp Trip.Unit Load Reduced (← links)
- 05000260/LER-1981-033-03, /03L-0:on 810702,reactor Low Pressure Permissive Switch for Recirculation Pump Discharge Valve Actuation Switch 1 Failed.Cause Unknown.Switch Freed & Exercised to Verify Operability.Considered Random Failure (← links)
- 05000259/LER-1981-033-03, /03L-0:on 810614,during Refueling,Total as-found Primary Containment Leak Rate Exceeded Tech Spec Limit. Caused by Deterioration of Valve Seating Surfaces During Operation.Valves Repaired (← links)
- 05000259/LER-1981-040-03, /03L-0:on 810625,during Testing,Grinnell Snubber SS7 Was Found Low on Fluid.Caused by Leak at Threaded Connection Between Fluid Reservoir & Snubber.Grinnell Model F-16200,Size 2.5,Type HSSA-10 Snubber (Sn 10734) Rebuilt (← links)
- 05000259/LER-1981-040, Forwards LER 81-040/03L-0 (← links)
- 05000260/LER-1981-034-03, /03L-0:on 810630,RHR Svc Water Pumps B2,D-1 & D-2 Were Not in Svc.Caused by Removing B2 from Svc to Change Motor Oil & Tagging Closed Crosstie Valve to Unit 1, FCV-1-74-100.Oil Changed (← links)
- 05000260/LER-1981-031-03, /03L-0:on 810701,RHR Pump Room Cooler 3-A Developed Water Leak.Caused by Broken Silfos Joint on 1/4-inch Vent Line.Joint Resoldered (← links)
- 05000260/LER-1981-031, Forwards LER 81-031/03L-0 (← links)
- 05000296/LER-1981-032, Forwards LER 81-032/03L-0 (← links)
- 05000259/LER-1981-036, Forwards LER 81-036/03L-0 (← links)
- 05000296/LER-1981-031-03, /03L-0:on 810624,during Normal Operations 3-A Reactor Recirculation Pump Tripped Due to 2A-K45A Relay Action.Caused by Resistance Temp Detector High Temp Trip. Unit Load Reduced.Ge Motor Generator Set & Restarted (← links)
- 05000296/LER-1981-031, Forwards LER 81-031/03L-0 (← links)
- 05000260/LER-1981-030-03, /03L-0:on 810629,while Performing Surveillance Insp 4.5.B.1.D,valve 2-FCV-2-74-57 Became Inoperable,Making RHR Loop I Inoperable.Caused by Geared Limit Finger Base Breaking Off of Operator.Finger Base Replaced (← links)
- 05000260/LER-1981-029-03, /03L-0:on 810621,flow Bias Loop a Drifted High, Affecting Average Power Range Monitors A,C & E & Rod Block Monitor A.Caused by Electronic Failure of GE Model 563-02 Flow Totalizer.Flow Totalizer Replaced (← links)
- 05000259/LER-1981-034, Forwards LER 81-034/03L-0 (← links)
- 05000260/LER-1981-010, Forwards Updated LER 81-010/03L-1 (← links)
- 05000296/LER-1981-010-03, /03L-0:on 810213,drywell High Pressure Switch 3-PS-64-58C Found Above Tech Spec Limit.Caused by Setpoint Drift.Switch Recalibr & Will Be Replaced (← links)
- 05000296/LER-1981-010, Forwards LER 81-010/03L-0 (← links)
- 05000296/LER-1981-030-01, /01T-0:on 810616,turbine First Stage Permissive Switches PS-1-81A & B & PS-1-91A & B Were Found Above Tech Spec Limit.Caused by Barksdale Model B2T-A12SS Setpoint Drift.Switches Reset (← links)
- 05000296/LER-1981-029, Forwards LER 81-029/01T-0 (← links)
- 05000260/LER-1981-028-01, /01T-0:on 810611,while Performing Routine Surveillance Test SI 4.2.B.8 During Maint Outage,Reactor High Pressure Switches Ps 68-93 Switch 2 & Ps 68-94 Switch 2 Were Above Tech Spec Limits.Caused by Setpoint Drift (← links)
- 05000260/LER-1981-028, Forwards LER 81-028/01T-0 (← links)
- 05000259/LER-1981-030-01, /01T-0:on 810609,during Installation of Interlock Sys for Secondary Containment Doors,Power Supply Inadvertently Interrupted to Interlocks.Units 1,2 & 3 Affected.Caused by Personnel Error.Power Restored (← links)
- 05000260/LER-1981-026, Forwards LER 81-026/03L-0 (← links)
- 05000259/LER-1981-027-03, /03L-0:on 810527,during Normal Operation While Performing Quarterly Surveillance Tests,Rod Sequence Control Restraint Calibr Test Was Not Performed.Caused by Schedule Inadvertently Left Blank.Test Performed (← links)
- 05000296/LER-1981-021-03, /03L-0:on 810507,during Routine startup,3B Recirculation Pump Motor Generator Set Field Breaker Indicated Light Out.Caused by Open Motor Generator Set Field Breaker Trip Coil.Breaker Replaced (← links)
- 05000260/LER-1981-022-03, /03L-0:on 810512,during Performance of High Water Level in Scram,Scram Discharge Vol Level Switch Found Inoperable.Caused by Float Disconnected from Switch Arm. Robertshaw Model SL-305-EI-X Level Switch Replaced (← links)
- 05000260/LER-1981-022, Forwards LER 81-022/03L-0 (← links)
- 05000296/LER-1981-019-03, During Shutdown,When HPCI Sys Initiated,Upper & Lower HPCI Gland Seal Condenser Head Gaskets Were Blown.Caused by Overpressurization of Tube Side of HPCI Gland Seal Condenser.Gaskets Replaced (← links)
- 05000259/LER-1981-016, Updated LER 81-016/01T-1:on 810501,during Test,Fire Pump Automatic Start Logic Found Inoperable.Caused by Wiring Removed from Terminal Points in Main Relay Panel 52,during Mod of Panel.Permanent Wire Replaced.Work Plan Revised (← links)