Pages that link to "05000259/LER-1981-078, Forwards Updated LER 81-078/03X-1"
Jump to navigation
Jump to search
The following pages link to 05000259/LER-1981-078, Forwards Updated LER 81-078/03X-1:
Displayed 20 items.
- ML20042A630 (redirect page) (← links)
- 05000259/LER-1981-078-03, During Refueling Outage, Continuous Air Monitor 1-RM-90-250 Declared Inoperable for 12 1/2-h.Only Four of Seven Required Hourly Samples Taken & Sampled.Caused by Personnel Error (← links)
- 05000259/LER-1981-078 (redirect page) (← links)
- ML20039D023 (redirect page) (← links)
- 05000259/LER-1981-094-03, /03L-0:on 811226,B Dihydrogen Dioxide Sample Return Pump Tripped & Would Not Reset.Caused by Locked Cam Bearing Due to Misalignment or Insufficient Lubrication. Cams & Cam Bearings Replaced (← links)
- 05000260/LER-1981-069-03, /03L-0:on 811231,scram Discharge Level Switch 2-LS-85-45E (25-gallon Rod Block) Found Inoperable.Cause Not Determined.Switch Replaced & Tested.Investigation Continuing (← links)
- 05000260/LER-1981-069, Forwards LER 81-069/03L-0 (← links)
- 05000296/LER-1981-073-03, /03L-0:on 811222,MSIVs 1-14,1-15,1-27,1-37,1-38 & 1-51 Exceeded Allowable Leak Rate of 11.5 Std Cubic Ft Per Hour.Cause Under Investigation.Valves Will Be Repaired & Retested.Detailed Rept by 820201 (← links)
- 05000259/LER-1981-068-03, /03X-1:on 811106,while Transferring 1B 480-volt Shutdown Board to Normal Per Tech Specs,Normal Breaker Failed to close,de-energizing Board.Caused by Safety Pin Inserted in Push Rod.Board Breaker Replaced (← links)
- 05000260/LER-1981-068-03, /03L-0:on 811211,reactor Low Water Level Switch 2-LIS-3-203D Switch 1 Operated Below Limit.Caused by Switch Calibr Drift.Barton Model 288A Switch Calibr & Returned to Svc.Util Preparing Action Re Design Change (← links)
- 05000259/LER-1981-085-03, /03L-0:on 811211,HPCI Suppression Chamber High Level Switches Discovered to Be Set 8 Inches Above Normal Level.Caused by Change to Tech Specs Not Being Reflected in Table 3.2.B.Switches Physically Lowered (← links)
- 05000259/LER-1981-085, Forwards LER 81-085/03L-0 (← links)
- 05000260/LER-1981-065-03, /03L-0:on 811211,HPCI Suppression Chamber High Level Switches Discovered to Be Set 8 Inches Above Normal Level.Caused by Change to Tech Specs Not Being Reflected in Table 3.2.B.Switches Physically Lowered (← links)
- 05000260/LER-1981-065, Forwards LER 81-065/03L-0 (← links)
- 05000296/LER-1981-075-03, /03L-0:on 811221,during Refueling Outage,Level Indicator LI-3-46B Was Out of Calibr.Indicator Could Not Be Calibr Due to Internal Problems.Indicator Replaced (← links)
- 05000259/LER-1981-086-03, /03L-0:on 811210,inspector Discovered That Reactor Water Level Not Being Perturbed on Each of Three Units Following Surveillance Instructions.Caused by Belief That Valving Level Instrument Provided Dynamic Response Check (← links)
- 05000296/LER-1981-075, Forwards LER 81-075/03L-0 (← links)
- 05000259/LER-1981-086, Forwards LER 81-086/03L-0 (← links)
- 05000259/LER-1981-092, Forwards LER 81-092/03L-0 (← links)
- 05000296/LER-1981-074-01, /01T-0:on 811230,2-stage Relief Valves Initially Failed to Lift within Allowable Range During as-found Set Pressure Tests.Cause Under Evaluation.Valves Will Be Reset, Repaired & Retested Prior to Installation (← links)
- 05000259/LER-1981-090, Forwards LER 81-090/03L-0 (← links)