Pages that link to "05000213/LER-1980-008, Forwards LER 80-008/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000213/LER-1980-008, Forwards LER 80-008/03L-0:
Displayed 10 items.
- 05000213/LER-1980-008 (redirect page) (← links)
- 05000213/LER-1980-007-03, /03L-0:on 800227,discovered Cracked Drain Line, Allowing Contaminated Water Into Area Where Svc Water Line & Steam Generator Blowdown Line Connect.Caused by Corrosion, Erosion & Lack of Support.Drain Line Sealed Off (← links)
- 05000213/LER-1980-004-03, /03L-0:on 800204,while Operating at Steady State Full Power,Power Operated Pressurizer Relief Valve 570 & Isolation Valve MOV-569 Opened.Apparently Caused by Spurious Signal from Pressurize Pressure Control Channel 1 (← links)
- 05000213/LER-1980-004, Forwards LER 80-004/03L-0 (← links)
- 05000213/LER-1980-005-03, /03L-0:on 800207,leak Was Discovered in B Boron Waste Storage Tank Thermo Syphon Heater.Caused by Crack in Lower Head to Pipe Weld of Heater.New Lower Head Fabricated & Installed (← links)
- 05000213/LER-1980-002-03, /03L-0:on 791224,during Mod of Drains in Emergency Diesel Generator 2A Cubical,Conduit Containing Neutral Leads to Transformer Were Cut.Caused by Const Drawings Not Indicating Proper Position of Conduit in Concrete Slab (← links)
- 05000213/LER-1980-002, Forwards LER 80-002/03L-0 (← links)
- 05000213/LER-1980-003-03, /03T-0:on 800129,review of Emergency Diesel Generator Loads Revealed Potential of Diesel Generator Overload Following Loss of Normal Offsite Power & Subsequent Accident.Caused by Failure to Analyze Situation Previously (← links)
- 05000213/LER-1980-003, Forwards LER 80-003/03T-0 (← links)
- 05000213/LER-1980-001-01, /01T-0:on 800103,during Routine Operability Verification Test,Timer for Containment Air Recirculation Fan F 17-3 Failed to Meet Tech Spec Limits.Caused by Four Timers Having Premature time-out Condition.Units Cleaned (← links)