05000334/LER-1981-077, Updated LER 81-077/03X-1:on 810817,increased Radiation Levels in Auxiliary Bldg Discovered.Caused by Crack in Welded Pipe Connection Joining Two 1A Degassifier Recovery Hx.Crack Due to Thermal Stress Fatigue

From kanterella
Redirect page
Jump to navigation Jump to search