Text
1 DiabloCanyonNPEm Resource From: Ferrer, Nathaniel Sent: Friday, June 25, 2010 1:06 PM To: Grebel, Terence; Soenen, Philippe R Cc: Green, Kimberly; DiabloHearingFile Resource
Subject:
Draft Telecon Summary 06-24-10 Fire Protection and AMPS Attachments:
Telecon Summary 06-24-10 Fire Protection and AMPs.doc Terry & Philippe, Attached is a draft of the Teleconference Call Summary from 6/24/2010. Please review and let me know if there are any corrections/changes needed.
Please let me know if you have any questions.
NathanielFerrerProjectManagerDivisionofLicenseRenewalOfficeofNuclearReactorRegulationU.S.NuclearRegulatoryCommission(301)415 1045 Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 1955 Mail Envelope Properties (26E42474DB238C408C94990815A02F090A76B4E29F)
Subject:
Draft Telecon Summary 06-24-10 Fire Protection and AMPS Sent Date: 6/25/2010 1:05:54 PM Received Date: 6/25/2010 1:05:58 PM From: Ferrer, Nathaniel Created By: Nathaniel.Ferrer@nrc.gov Recipients: "Green, Kimberly" <Kimberly.Green@nrc.gov>
Tracking Status: None "DiabloHearingFile Resource" <DiabloHearingFile.Resource@nrc.gov> Tracking Status: None "Grebel, Terence" <TLG1@PGE.COM> Tracking Status: None "Soenen, Philippe R" <PNS3@PGE.COM> Tracking Status: None
Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 408 6/25/2010 1:05:58 PM Telecon Summary 06-24-10 Fire Protection and AMPs.doc 72186 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
LICENSEE: Pacific Gas and Electric Company
FACILITY: Diablo Canyon Nuclear Power Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JUNE 24, 2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC COMPANY CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION-AGING MANAGEMENT PROGRAMS
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Pacific Gas and Electric Company (PG&E) held a telephone conference call on June 24, 2010, to obtain clarification on the staff's draft request for additional information (D-RAI) regarding the Diablo Canyon Nuclear Power Plant license renewal application (LRA).
By emails dated June 8, 2010, the staff sent D-RAIs to PG&E regarding aging management programs. PG&E reviewed the information contained therein, and requested a telephone conference call. The telephone conference call was useful in clarifying the intent of the staff's D-RAIs. Enclosure 2 provides discussions on D-RAI for which the applicant requested clarification. No changes to other D-RAIs were necessary as a result of this telephone conference call. Formal RAIs will be issued by a separate letter.
Enclosure 1 provides a listing of the participants.
The applicant had an opportunity to comment on this summary.
Nathaniel Ferrer, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
As stated
cc w/encl: See next page
OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME NFerrer DWrona NFerrer DATE / /10 / /10 / /10 / /10
Enclosure 1 TELEPHONE CONFERENCE CALL DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JUNE 24, 2010
PARTICIPANTS A FFILIATIONS Nate Ferre r U.S. Nuclear Re g ulator y Commission (NRC)James Medof f NRC Naeem I qbal NRC Yo gen Garud A r gonne National Laborator y (ANL) Terr y Grebel Pacific Gas and Electric Com p an y (PG&E)Phili ppe Soenen PG&E Michael Wri ght PG&E K yle Duke PG&E Daniel Hardest y PG&E Chalmer M y e r Strate gic Teamin g And Resource Sharin g (STARS)Dave Kunsemille r STARS
Enclosure 2 Diablo Canyon Nuclear Power Plant, Units 1 and 2 License Renewal Application Draft Request for Additional Information Fire Protection
D-RAI 2.4-1 Section 2.4 of the LRA does not include the following fire barrier and other fire protection
components:
Table 2.4.-1, fire barrier seals Table 2.4-3, fire barrier coatings and wraps Table 2.4-7, fire barrier coatings Table 2.4-8, fire barrier coatings Table 2.4-9, fire barrier coatings Table 2.4-10, fire barrier seals and fire barrier coatings Table 2.4-11, trash racks and traveling screens The staff requests that the applicant verify whether the above fire barrier assemblies and fire protection components are within the scope of license renewal within the identified structure accordance with 10 CFR 54.4(a) and subject to an AMR in accordance with 10 CFR 54.21(a)(1). If they are excluded from the scope of license renewal and not subject to an AMR, the staff requests that the applicant provide justification for the exclusion.
Discussion: For the components of concern for Table 2.4-11, the applicant referred to the staff to LRA Table 2.4-10. The staff agreed that the components were listed within the scope of license renewal within LRA Table 2.4-10. The staff will revise this question as follows. The revised question will be sent as a formal RAI.
RAI 2.4-1 Section 2.4 of the LRA does not include the following fire barrier and other fire protection
components:
Table 2.4.-1, fire barrier seals Table 2.4-3, fire barrier coatings and wraps Table 2.4-7, fire barrier coatings Table 2.4-8, fire barrier coatings Table 2.4-9, fire barrier coatings Table 2.4-10, fire barrier seals and fire barrier coatings The staff requests that the applicant verify whether the above fire barrier assemblies and fire protection components are within the scope of license renewal within the identified structure accordance with 10 CFR 54.4(a) and subject to an AMR in accordance with 10 CFR 54.21(a)(1). If they are excluded from the scope of license renewal and not subject to an AMR, the staff requests that the applicant provide justification for the exclusion.