E-Mail from Giles to Ohara, Salem ISI Program Dates
ML102940101
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/24/2010
From: Giles E G
Public Service Enterprise Group
To: O'Hara T L
Division of Nuclear Materials Safety I
References
FOIA/PA-2010-0334
Download: ML102940101 (3)


Text

OHara, Timothy From: Giles, Edley [Edley.Giles@pseg.com]

Sent: Monday, May 24, 2010 5:15 PM To: OHara, Timothy Cc: Colville, Kerry A.; Berrick, Howard G.

Subject:

RE: Salem ISI Program Dates Requested information; (1) Beginning and ending dates for Saiem Unit 1 second interval?2127/1988

-511912001 (2) Beginning and ending dates for Salem Unit 2 second interval?5/10/1992

-11/2712003 (3) Which periods within the Salem Unit 1 second interval were the IWA-5244 tests missed? Also, can you provide the dates of each period within the interval?Unit 1 2"nd Interval period dates I't Period [2127/1988

-412611991]

Outages IR8 (312811989-6118/1989)

& 1R9 (212/1991

-412611991)

No IWA-5422 testing on buried piping performed 2'd Period [4/27/1991

-411711998]

Outages IR10 (4/4/1992

-8117/1992), 1RII (10/2/1993

-212/1994)

&SRI 2 (4/7/1995

-4/17/1998)***

No IWA-5422 testing on buried piping performed 3V Period [4/18/1998-511912001]

Outages 1R13 (9/1711999-10/26/1999)

& IR14 (4)6/2001

-5/1912001)

No IWA-5422 testing on buried pip"in performed*** extended shutdown (4) Which periods within the Salem Unit 2 second interval were the IWA-5244 tests missed? Also, can you provide the dates of each period within the interval?Unit 2 2 nd Interval period dates 1t Period [5/10/1992

-5/1011995]

Outages 2R7 (3/17/1993

-713/1993)&

2R8 (10/15/1994-2/1611995)

No IWA-5422 testing on buried piping performed 2"d Period [5/11/1995

-11/15/2000]

Outages 2R9 (6/8/1995

-8129/1997)***, 2R1 0 (413/1999

-5/28/1999)

&2R111 (10/612000-11/1512000)

No IWA-5422 testing on buried piping performed 3V Period [11/16/2000

-11/27/2003]Outages 2R12 (4/512002

-,5/1712002)

& 2R13 (10/9/2003-11/27/2003)

No IWA-5422 testing on buried piping performed extended shutdown (5) Were the required tests performed on Unit 2 during the first interval?*Yes; The ten-year hydro Pressure Drop Test technique used on Unit I during the 1t Interval was also used for Unit 2 1 st interval ten-year hydro, Have Pressure Test datasheet dated 319/1992 for Line to 22SG only (*have not found datasheet for line to 24SG yet).*Have not found evidence that the required periodic pressure test were performed during the Ist intervals Ist and 2 nd periods as required by 74' edition 75' summer addenda, IWA-5440, IWD-2400 &IWD-2600(b), still looking.(6) What are the interval and period dates for interval 3? Have the tests been missed for interval 3 for Salem Unit 1 or 2?3rd Intervals Unit 1 5/1912001

-5/19/2011 1 st Period [5/19/2001

-6/312004]

Outages IR15 (10/10/2002

-11/0612002)

& 1R16 (3/26/2004

-613/2004)

No IWA-5422 testing on buried piping performed h bmn aufon in this record wa s de Le. i PMOIev

  • r2rndPeriod

[6/412004

-512012008]

Outages IR17 (1011112005

-111612005)

& IR18 (3127/2007

-4/20/2007)

No IWA-5422 testing on buried piping performed 3 rd Period [5121/2008-5/1912011]

Outages 1R19 (10/1412008

-11/1112008)

& 1R20 (4/3/2010-412312010)

Pressure test on buried pipingt during replacement activities 1R20 Unit 2 11/27/2003

-11/27/2013 1'st Period [11127/2003

-11126/2006]Outages 2R14 (5/4/2005

-5/11/2005)

& 2R15 (10/10/2006

-11/112006)

No IWA-5422 testing on buried piping Derformed 2"r Period [11/27/2006

-11/26/201 0]Outages 2R1 6 (3/11/2008

-5/8/2008)

& 2R1 7 (10/13/2009

-11/11/2009)

No IWA-5422 testing on buried piping performed YET!3 rV Period [1112712010

-11/2712013]Outages 2R1 8 (scheduled spring 2011) & 2R19 (scheduled fall 2012)Regards, Tim Giles From: OHara, Timothy [1]

Sent: Monday, May 24, 2010 2:19 PM To: Giles, Edley Cc: Colville, Kerry A.; Berrick, Howard G.

Subject:

Salem ISI Program Dates Hello Tim, Can you please provide the following information:

(1) Beginning and ending dates for Salem Unit 1 second interval?(2) Beginning and ending dates for Salem Unit 2 second interval?(3) Which periods within the Salem Unit 1 second interval were the IWA-5244 tests missed? Also, can you provide the dates of each period within the interval?(4) Which periods within the Salem Unit 2 second interval were the IWA-5244 tests missed? Also, can you provide the dates of each period within the interval?(5) Were the required tests performed on Unit 2 during the first interval?(6) What are the interval and period dates for interval 3? Have the tests been missed for interval 3 for Salem Unit 1 or 2?A reply via email is fine. If a phone call would be better let me know and we can do that also. Thanks.Tim OHara 2 I CoP t/ itt