ML103190275

From kanterella
Revision as of 05:00, 20 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Watts Bar Nuclear Plant, Unit 2 - Amendment 101 to Final Safety Analysis Report (Fsar), Figure 2.5-571, ERCW Pipeline, Section A-A, Sheet 4 of 4
ML103190275
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/29/2010
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML103190275 (1)


Text

750 740 730 720 710 700 690 680 670 660 50 51 '52 53 54 57 I I 1 I I I 1 A-A -1 /CCLASS "A" BACK AUX BLOG PIPE TUNNEL- -- UNIT i ILL 7 750 1 740 730 i 720 - 710 - 700 690 1 680 670 660 POTENTIAL SETTLEMENT BASED ON I. 5 O/t

  • CRITERIA (INCHES) (E) POTENTIAL SETTLEMENT BASED ON 6% 6 CRITERIA (INCHES) - DESIGN WATER TABLE -!E WATER TABLE (24. HR) MH SOIL CLASSIFICATION I3 BLOW COUNT POTENT I ALLY L I QUEF IA BLE SO I L (SEE NOTE) -WS WEATHER1ED SHALE NOTE: I. LtQ~EFACT~ON BASED ON TOP OF GROUND ACCEtlERATlON OF 0.49 AND SEED - IDRtSS (1971) CORRELATION FOR SANDS. Added by Amendment 50 WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYStS REPORT 1 ERCW PIPELINE SECTION A-A SREET 4 OF 4 FIGURE 2.5-571 ,