ENS 40081

From kanterella
Revision as of 17:44, 24 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ENS 40081 +/-
Where
Catawba Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+2.48 h0.103 days <br />0.0148 weeks <br />0.0034 months <br />)
Opened: Tom Poetzsch
14:22 Aug 16, 2003
NRC Officer: Steve Sandin
Last Updated: Aug 16, 2003
40081 - NRC Website
Loading map...