ENS 41080
From kanterella
Revision as of 17:42, 24 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
ENS Event | |
---|---|
15:00 Sep 29, 2004 | |
Title | Random Fitness For Duty Test |
Event Description | A random fitness for duty test determined that an Entergy Supervisor tested positive for alcohol. This was confirmed under the fitness for duty program at approximately 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />. A work history review has been conducted and no work or behavioral issues identified. Removal of access authorization was not established.
The NRC Resident Inspector will be notified of this event by the licensee. |
Where | |
---|---|
Indian Point New York (NRC Region 1) | |
Reporting | |
10 CFR 26.73 | |
Time - Person (Reporting Time:+-0.38 h-0.0158 days <br />-0.00226 weeks <br />-5.20524e-4 months <br />) | |
Opened: | Steve Prussman 14:37 Sep 29, 2004 |
NRC Officer: | John Mackinnon |
Last Updated: | Sep 29, 2004 |
41080 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 41080\u003C/a\u003E - \u003Ca href=\"/Indian_Point\" title=\"Indian Point\"\u003EIndian Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ERandom Fitness for Duty Test\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 41080 - Indian Point\n","link":"","lat":41.26799722222222,"lon":-73.9514,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 439972008-02-20T16:00:00020 February 2008 16:00:00
[Table view]10 CFR 26.73, Applicability Fitness for Duty Report Involving a Contractor Supervisor ENS 419242005-08-17T14:00:00017 August 2005 14:00:00 10 CFR 26.73, Applicability Fitness for Duty ENS 413532005-01-24T15:00:00024 January 2005 15:00:00 10 CFR 26.73, Applicability Fitness for Duty Report ENS 410802004-09-29T15:00:00029 September 2004 15:00:00 10 CFR 26.73, Applicability Random Fitness for Duty Test 2008-02-20T16:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_41080&oldid=93040"