TAC:ME7225
From kanterella
Revision as of 11:18, 30 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Request for: Approved, Closed | |
Initiation
| |
| From | |
MONTHYEAR05000328/LER-2011-001-01, For Sequoyah Nuclear Plant, Unit 2 Regarding Nuclear Instrumentation System Power Range Neutron Flux Trip Low Range Bistable Incorrectly Calibrated - Revision 12011-09-29029 September 2011
[table view]For Sequoyah Nuclear Plant, Unit 2 Regarding Nuclear Instrumentation System Power Range Neutron Flux Trip Low Range Bistable Incorrectly Calibrated - Revision 1 ML11307A3692011-10-31031 October 2011 NRR E-mail Capture - Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP ML12019A2642012-01-13013 January 2012 NRR E-mail Capture - Sequoyah, Unit 1 LAR - Heavy Load Lifts and UHS One Time Change in Support of Unit 2 SGRP ML12034A2272012-02-0202 February 2012 NRR E-mail Capture - Sequoyah, Unit 1 LAR - Heavy Load Lifts and UHS One Time Change in Support of Unit 2 SGRP ML12046A6462012-02-10010 February 2012 Response to NRC Request for Additional Information Regarding the Heavy Load Lifts and UHS One Time Change in Support of Unit 2 SGRP ML12089A4912012-03-0505 March 2012 Response to NRC Second Request for Additional Information Regarding the Heavy Load Lifts and UHS One Time Change in Support of Unit 2 SGRP ML12114A0612012-04-0505 April 2012 Technical Report, SQN2-SGR-TRI, Revision 3, Sequoyah Unit 2 Steam Generator Replacement Rigging and Heavy Load Handling ML12114A0602012-04-0505 April 2012 Cover Letter - Revision to the Sequoyah Unit 2 Steam Generator Replacement Rigging and Heavy Load Handling Technical Report, SQN2-SGR-TR1, Submitted in TVAs Heavy Load Lifts and UHS One Time Change in Support of Unit 2 SGRP ML12121A2332012-05-0202 May 2012 Meeting Notice - Notice of Forthcoming Meeting Via Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1, Heavy Loads Amendment Request (TAC No. ME7225.) ML12144A2972012-05-22022 May 2012 Response to Nuclear Regulatory Commission (NRC) Third Request for Additional Information Regarding the Heavy Load Lifts and UHS One Time Change in Support of Unit 2 SGRP ML12136A5222012-07-0505 July 2012 Summary of Public Telephone Call with Tennessee Valley Authority Regarding Heavy Load Lifts License Amendment Request Risk Informed Request for Additional Information ML12213A0352012-07-30030 July 2012 NRR E-mail Capture - Sequoyah 1 - Heavy Loads LAR ML12234A3812012-09-0606 September 2012 Issuance of Amendment Regarding the Proposed Operating License and Technical Specification Changes for Unit 2 Replacement Steam Generator Project to Conduct Heavy Load Lifts ML12263A1632012-09-20020 September 2012 Safety Evaluation Corrections for Amendment No. 330 Associated with Unit 2 Replacement Steam Generator Project to Conduct Heavy Load Lifts (TAC No. ME7225) (TS-SQN-2011-05) 2012-04-05 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:ME7225&oldid=922786"