ML17319A799

From kanterella
Revision as of 09:07, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Ro:On 810331,low Level Alarm Contacts on Spray Additive Tank Discovered Wired Backwards Precluding Low Level Alarm from Annunciating.Followup Rept to Be Submitted by 810413
ML17319A799
Person / Time
Site: Cook 
Issue date: 03/31/1981
From: SHALLER D V
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8104070270
Download: ML17319A799 (4)


Text

g REGULA RY INFORMATION DISTRIBUTI SYSTEM (RIDS)DOCKET: 0 05000316 05000316'CCESSION NBR!81040702'70., DOC~DATE'!81/03/31'OTARIZED!

NO FACILe50..

316" Donald-.C'Cook Nuclear Power Plantr.Unit 2q 1ndiane S AUTH~NAME>>AUTHOR AFF ILIIATION SHALLERiD,V

~" Indiana S Michigan Electr ic Co, REC IP~NAlhEl REC IP IENT AFF IL'IA'TION KEPPLER~J,G, Region 3r Chicago<Office" of the'irector

SUBJECT:

.RO!on 810331',low leVel alarm contacts op=spray additive'ank~

discovered wired,backwards precluding

).ow level.alerp from annunciating.Fo'llowup rept to be, submitted by 810413, DISTRISUTIDN CODE;;ROOTS COPIES RECEIVED:LTR

'NCl.'SIZE:: I'"'ITLK4 l.ER (Backf it).If NOTES I Send 3.copi es" of el l material to IS E~, RECIPIENT ID CODE/NAME)

COPIES l.TTR ENCL REC IP IENT ID CODE/NAMEI COPIES LTTR ENCL" INTERNALS AEOD ISED ftC--G FIL EXTERNALS.

LPDR 04 02'1 03.2: 2'ASLBP/J"'0 HARD-MPA OP EX EVAL BR NSIC 1 1 1 gp~eel if TOTAl NUMBER OF COPIES REQUIRED: LTTR~ENCL J Jl r~I&I li'r r 4-I li rr lr r II e'o merlcen leotHa~yet~INDIA NA&MICHIGA N EI EC TRIC COMPA N Y DONALD C.COOK NUCLEAR PLANT P.O.Box 458, Bridgman, Michigan 49106 (616)465-5901 March 31, 1981 Mr.J.G.Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No.50-316

Dear Mr.Keppler:

This is to confirm our verbal report to Mr.E.Swanson, NRC Region III Inspector, at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on March 31, 1981.At that time we reported that during an eighteen month surveillance on the Unit II2 Spray Addi-tive Tank it was discovered that the low level alarm contacts were wired backwards precluding the low level alarm from annunciating.

A followup report will be submitted by April 13, 1981, as required by Technical Specification Section 6.9.1.8.Sincerely, D.V.Shaller Plant Manager/bab cc: J.E.Dolan R.S.Hunter R.W.Jurgensen R.F.Kroeger R.W.Kilburn E.Swanson/N.

DuBry RO:III R.C.Callen MPSC J.M.Hennigan W.Lavallee EPRI PNSRC J.F.Stietzel E.L.Townley Dir., IE (40 copies)Dir., MIPC (4 copies)phoo)5 ,/o ll ll 4 t 1'h./'I ll