|
---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML24108A1562024-04-15015 April 2024 Updated Final Safety Analysis Report (Ufsar), Revision 26 and Fire Protection Report (Fpr), Revision 11 RS-22-052, 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted)2022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 5 of 7 (ML22111A243 Redacted) ML22111A2462022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22111A2532022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22111A2302022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22111A2342022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22111A2392022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 1 of 7 ML22146A3812022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (ML22111A249 Redacted) ML22146A3792022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 7 of 7 (ML22111A245 Redacted) ML22146A3802022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (ML22111A248 Redacted) ML22146A3822022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Appendices (ML22111A254 Redacted) ML22111A2362022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems ML22111A2502022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22111A2472022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22111A2282022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Letter and Attachments A-F ML22111A2522022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML22111A2512022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22111A2322022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22111A2332022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22111A2292022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, List of Effective Pages ML22146A3682022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (ML22111A235 Redacted) ML22146A3782022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 6 of 7 (ML22111A244 Redacted) ML22146A3702022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System (ML22111A238 Redacted) ML22146A3692022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (ML22111A237 Redacted) ML22146A3732022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 2 of 7 (ML22111A240 Redacted) ML22146A3762022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 4 of 7 (ML22111A242 Redacted) ML22146A3742022-04-13013 April 2022 5 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 3 of 7 (ML22111A241 Redacted) ML20153A7922020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 009 Chap 09 Auxiliary Systems-ML20111A256 Redacted ML20153A8182020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 015 Chap 09 Figures Part 6 of 7-ML20111A262-Redacted ML20153A8152020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 014 Chap 09 Figures Part 5 of 7-ML20111A261-Redacted ML20153A8122020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 013 Chap 09 Figures Part 4 of 7-ML20111A260-Redacted ML20153A8212020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 016 Chap 09 Figures Part 7 of 7-ML20111A263-Redacted ML20153A7992020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 011 Chap 09 Figures Part 2 of 7-ML20111A258-Redacted ML20154K6122020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of Usfar Rev 24 and FPR Rev 9 - 020 Chap 13 Conduct of Operations-ML20111A267-Redacted ML20154K6082020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 019 Chap 12 Radiation Protection-ML20111A266-BKV-Redacted ML20150A2592020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 008 Chap 08 Electric Power-ML20111A255_Redacted ML20147A6712020-06-0404 June 2020 EPID-L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 001 Appendices (Amended)-ML20133J880_Redacted ML20147A6762020-06-0404 June 2020 EPID-L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 001 LAS FRP Rev_9 ML 20111A273-Redacted ML20150A2562020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 006 Chap 06 Eng Safety Features-ML20111A253_Redacted ML20153A8102020-06-0404 June 2020 EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 012 Chap 09 Figures Part 3 of 7-ML20111A259-Redacted ML20111A2482020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML20111A2512020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML20111A2572020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 9, Figures, Part 1 of 7 ML20111A2692020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML20111A2652020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20111A2462020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Table of Contents ML20111A2502020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems ML20111A2452020-04-13013 April 2020 Submittal of Revision 24 to Updated Final Safety Analysis Report and Revision 9 to Fire Protection Report ML20111A2682020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML20111A2702020-04-13013 April 2020 4 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications 2024-04-15
[Table view] |
Text
LASALLECOUNTYSTATIONUPDATED SAFETYANALYSISREPORTFIGURE9.1-1NEWFUIiLSTORAGEREV.0-APRIL1984 TYPICALCELLCAVITY3045/5CELLWALLSACROSSSECTIONAL VIEWOFANAAAAYCW1T000AGE-oXULATERALFLOWHOLESADJUSTABLE SUPPORTLEGS304S11lltEATIUIG LASA'IFCOUNTYSTATIONUPDATEDFIW.SAFETY REPORTFIGUREQ.1-2aUnIt1SpIftFUllsang.PIGURE9.1-2.REV.10-APRIL1994 fIIl..IIIIIIL.II......-PEDESTAL500Y'-F'USLON\llIEl-OSRACK)6 IPEDESTALt2Pl!:J\fCEl.i.""ALl./JIrC14PERRAC:O-80RAF't.EX l.&VEl.*'4::POISON*()(JCENTERPEDESTALIIPERRACItIJf!',!lASE:P!.AT!:ITYf>lCAt,.
EACHC:::':'I,i"'.,_Lryp-'-:-;IBOIMFLEx,POISONIIJ..,N1/'tu:R 1AI_',02.0$'j/Cco'"
ft.""I;.J.I]!i--l5ti--Ii!LASALLECOUNTYSTATIONUPDATEDFINALSAFETYANALYSISREPORTFIGURE9.1-2bUnit2SpentFuelStorageREV.6-APRIL1990 18CONTROLRODSTORAGE::234::f15x16-6'I235<l5x17-...201t::.2402:.15...05xlS).....240",15xl6IlC1S(15xl)217..u...l...&..1.-ll
- ,x16-23j-JII1D2frJI,:<lSxlS1./
23):1..........;.<;+.--4073't'J::Rm.
SPENTFeEL CONTROLRODGUIDETUBESTORAGELASALLECOUNTYSTATIONUPDATEDFINALSAFElYANALYSISREPORTFIGURE9.1-2cUnit2SpentFuelStoragePlanArrangement REV.6-APRIL1990 "ACMIliECIIANNELSTOllAGEIWX__4DEFECTIVEFUELSTOllAGE_-InIl."COIITlOLtel)----0.,010 GUIDEMESTOllAGEn,-FUELPU'.MACMllfEi_.<:.....,tISCOIiTtOL1lCl)STClIlAGEII""'!,,IIIII-I!I'I'-_...1\*1....21COIITIOLtel)STORAGELASALLECOUNTYSTAnOHUPDATEDF1NALSAFETYANALYSISREPORTFIGURE9.1-2dUnl1SpentFUllStcngePIMAn'angemerr FIGURE9.1-2dRIV.10-APRIL1994 LSCS-UFSAR FIGURE 9.1-3 REV. 10 - APRIL 1994 THIS PAGE INTENTIONALLY LEFT BLANK LASALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT FIGURE 9.1-3 UNIT 1 SPENT FUEL POOL ECCENTRIC POSITIONING LSCS-UFSAR FIGURE 9.1-4 REV. 10 - APRIL 1994 THIS PAGE INTENTIONALLY LEFT BLANK LASALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT FIGURE 9.1-4 FUEL STORED IN CONTROL ROD RACKS LSCS-UFSAR FIGURE 9.1-5 REV. 10 - APRIL 1994 THIS PAGE INTENTIONALLY LEFT BLANK LASALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT FIGURE 9.1-5 ABNORMAL FUEL STORAGE CONDITIONS I.iI17-102.Iil23-0II1r-JII B\):i:!*ItII\III I.-
II--;X;\/--I--4I
- IIIIIrtll.ft-t----t--l...
IIIII'Ih/\II:'I'I:1:-1"1IIr-------..1-,_JL_ri:.REACTOR.IIIItil=I1231II1IIII_1---CASKPATHLASALLECOUNTYSTATIONUPDATEDFINALSAFETYANALYSISREPORT(ALSORUNWAYDIRECTION)
FIGURE9.1-6REFUELING FLOORPLANREV.0-APRIL1984 I,SCSUf'SJ\RFigure9.1-7,"¥";
,,!'*i"",4",i:/o:::7)l(':,t,iJi,ll',,'yxn'TTrn'Tl"nnTTrn,ITnn'Trn1""f*
"::!H"lIfl,",,',..1%:'!litW16151413121110987654 1
12r1-r
....
67lF'"'"l'r""<
78.....TI.:
89r-1--
LASALLECOUNTYSTATIONUPDATEDFINALSAFETYANALYSISREPORTFIGURE9.1-7NEWFUELSTORAGEVAULTFIGURE9.1-7REV.11-APRIL1996 LSCS-UFSAR 690VolumeV5Elevation 689......>.....J....tilc:688....;E..,-....ea.c....687c0......,..>......Iol686685 VolumeinAcreFeetLASALLECOUNTYSTATIONUPDATEDFINALSAFETYANALYSISREPORTFIGURE9.2-1CAPACITYCURVEFORLSCSULTIMATEHEATSINKREV.14,APRIL2002I ICALCULAnONNO.L-002457REVISIONNO.5PAGENO.Hl9ofH277IFigureH7.5,Case3a:UHSLOCATemperature Transient Worst31-DayTemperature Period(d=18",t=0900hrs,Ti=102.3F)160...--------------------------------------....,
140-120+',--------------------------------------------------------------------------------1
---I----------------------------
-UHSInletTemperature!
___
'40-1---------------------------
G:"100o-!::s!80*Q.E6020-1----------------
o123456789 10111213141516 171819202122232425262728293031DaysafterSCRAMLASALLECOUNTYSTATIONUPDATEDFINALSAFETYANALYSISREPORTFIGURE9.2-2UHSTEMPERATURE RESPONSETOLOCAWORST31-DAYTEMPERATURE CONDITIONS REV.17,APRIL2008 ICALCULAnONNO.L-002457REVISIONNO.5PAGENO.H21ofH277FigureH7.7,ease3c:UHSLOCADrawdownWorst30DayEvaporation WeatherPeriod(d==18*,t=1200hrs,n==102.3F)690.20-r--------------------------------------,
690.00-k-------------------------------------l
"'''"::c----------
688.80689.00689.60-689.80689.40iiii689.20 U)::I::::>>688.6030252015DaysafterSCRAM105688.40 oLASALLECOUNTYSTATIONUPDATEDFINALSAFETYANALYSISREPORTFIGURE9.2-3URSTEMPERATURE RESPONSETOLOCAWORST30-DAYEVAPORATION CONDITIONS REV.17,APRIL2008 LSCS- UFSAR REV. 17, APRIL 2008
Figure 9.2-4 has been deleted LSCS- UFSAR REV. 17, APRIL 2008
Figure 9.2-5 has been deleted LSCS*UFSAR LASALLECOUNTYSTATIONUPDATEDFINALSAFETYANALYSISREPORTFIGURE9.2-6UHSHEATLOADFOLLOWING LOCAREV.14,APRIL2002I LSCS- UFSAR REV. 17, APRIL 2008 Figure 9.2-7 has been deleted LSCS-UFSAR 5200(12.0%,5150Gal)51005000,.-,a49008-0>-ij4800E-<Unacceptable i£Operation 47004600(13.4%,4587Gal)(13.8%,5150Gal)(13.8%,4587Gal)4500111213Concentration
(%byweight)1415LASALLECOUN'lYSTA'l10NUPDATEDFINALSAFETYANALYSISREPORTFIGURE9.3-1SODIUMPENTABORATE VOLUMECONCENTRATION REQUIREMENTS REV.16,APRIL2006 140130120110iZ100U.IQ:;;:)l-90<Q:;U.IlL.::IE80U.Il-7060504001015202530PERCENTSODIUMPENTABORATE BYWEIGHTOFSOLUTION40LASALLECOUNTYSTATIONUPDATEDFINALSAFETYANALYSISREPORTFIGURE9.3-2SATURATION TEMPERATURE OFSODIUMPENTABORATE REV.0-APRIL1984 REV.14,APRIL2002REV14o;TYPICALARCAINSCRVICEBUILDING80:tHhtlDfFIER STrAMGtNfilA1Cl1:
ISChIT-OF-S£RVlCE{OOS>