ML15237A259

From kanterella
Revision as of 20:53, 30 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Susquehanna Steam Electric Station - 2014 Annual Financial Report -PLA-7350
ML15237A259
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/16/2015
From: Franke J A
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7350
Download: ML15237A259 (1)


Text

Jon A. FrankeSite Vice President Susquehanna

Nuclear, LLC769 Salem Boulevard
Berwick, PA 18603Tel. 570.542.2904 Fax 570.542.1504 Jon.franke~talenenergy.com TALENENERGYJUL 1 6 2015U. S. Nuclear Regulatory Commission Attn: Document Control DeskWashington, DC 20555-000 1SUSQUEHANNA STEAM ELECTRIC STATION2014 ANNUAL FINANCIAL REPORTPLA-735010 CFR 50.71Docket Nos. 50-3 87and 50-388In accordance with 10 CER 50.7 1(b), enclosed is the Annual Report for PPL Corporation, the parent company of PPL Susquehanna, LLC in 2014, and the 2014 Annual Report forAllegheny Electric Cooperative, Inc.If you have any questions, please contact Mr. Jeffery N. Grisewood, Manager NuclearRegulatory Affairs at (570) 542-1330.

There are no regulatory commitments identified in this letter.Sincerely SSite Vice President SEnclosure 1 -PPL Corporation Annual Report 2014Enclosure 2 -Allegheny Electric Cooperative, Inc. Auditor's Report and Consolidated Financial Statements

-December 31, 2014 and 2013Copy: NRC Region IB. R. Fuller, DEP/BRPJ. E. Greives, NRC Sr. Resident Inspector J. A. Whited, NRC Project Manager