ML17263A827

From kanterella
Revision as of 12:55, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Informs That Util Successfully Completed Repairs of MDAFWP B on 940831.Pump Parameters as Documented in Post Maint Testing of MDAFWP B Provided in Encl.Nrc Approved Enforcement Discretion Not Required or Used
ML17263A827
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/31/1994
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: MARTIN T T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17263A826 List:
References
NUDOCS 9411030359
Download: ML17263A827 (2)


Text

i//!iirrrrrr/I/Iarrriilifr

//////////i

///lf/Ill/8 ROCHESTER GASANDEIECTRICCORPORATION

~89EASTAVENU@C1ROBERTCMECREOYVicePreridenr CinnaNuclearPioduclion August31,1994TELEPHONE rriiEACOOEPie 546-2TOOU.S.NuclearRegulatory Commission RegionalAdministrator, RegionIMr.ThomasT.Martin475Allendale RoadKingofPrussia,PA19406

Subject:

RequestForEnforcement Discretion R.E.GinnaNuclearPowerPlantDocketNo.50-244

Reference:

a.LetterfromR.C.Mecredy,RG&E,toT.T.Martin,NRC,

Subject:

"RequestForEnforcement Discretion,"

datedAugust30,1994.

DearMr.Martin,

Inaccordance with10CFRPart2,AppendixC,andusingtheguidancecontained inNRCInspection ManualPart9900,RG&Ehadrequested Enforcement Discretion onAugust30,1994withrespecttoGinnaStationTechnical Specification 3.4.2.1.a (Ref.a).Mlsrequestwasacontingency actionintheeventthatnecessary repairsandtestingofMotor-Driven Auxiliary Feedwater (MDAFW)PumpBcouldnotbecompleted withinthesevendayLCOlimitwhichexpiredonAugust31,1994at0530hours.Merequested Enforcement Discretion wasverballyapprovedbytheNRCduringaphoneconversation betweenMr.WilliamLazarusNRC,RegionI,andRobertMecredy,VicePresident, NuclearProduction atapproximately 1720ESTonAugust30,1994.RG&Esuccessfully completed repairsofMDAFWPumpBonAugust31,1994at0508hours.Thepumpparameters asdocumented inthepostmaintenance testingofMDAFWPumpBareprovidedinAttachment A.Therefore, theLCOwasexitedbeforetheexpiration ofthesevendayLCOlimitandtheNRCauthorized.

Enforcement Discretion wasnotrequiredorused.Verylyyours,cC'obertC.MecredXC:U.S.NuclearRegulatory Commission OfficeofNuclearReactorRegulation Assistant DirectorforRegionIReactorsMr.JoseA.CalvoWashington, D.C.20555GinnaStationSeniorResidentInspector II94gi030359

~4>02IPDRADDCK05000244PPDR ATTACHMENT A"B"MotorDrivenAuxiliary Feedwater PumpPerformance DataPre-Major Maintenance Test:(Degraded Condition)

TestDateDP(PSID)Acceptance Criteria(PSID)Flow(GPM)Vibration (MilsDisp)8/26/941123.21125.5InbdOutbdVertVert.08'10.12.14InbdOutbdHorizHorizPost-Major Maintenance Test:(RepairCompleted)

TestDateDP(PSID)Acceptance Criteria(PSID)Flow(GPM)Vibration (MilsDisp)8/31/941224.41125.5200InbdOutbdInbdVertVertHoriz.08.08.07OutbdHoriz.09