ML17265A265

From kanterella
Revision as of 11:38, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1998 for Re Ginna Nuclear Power Plant.W/980506 Ltr
ML17265A265
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1998
From: WALDEN J V, WIDAY J A
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9805140326
Download: ML17265A265 (8)


Text

CATEGORYREGULATRYINFORMATION DISTRIBUTIO SYSTEM(RIDS)ACl"ESSION NBR:9805140326 DOC.DATE:

98/04/30NOTARIZED:

NOFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAMEAUTHORAFFILIATION WALDEN,J.V.

Rochester GasSElectricCorp.WIDAY,J.A.

Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DOCKET05000244VISSING,G.S.

SUBJECT:

Monthlyoperating reptforApr1998forREGinnaNuclearPowerPlant.W/980506 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).

CA,'5000244 E.GRECIPIENT IDCODE/NAME PDl-1PDINTERNAL:

AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL:

LITCOBRYCE,JHNRCPDR11-ILECENTER011RGN11111NOACCOPIESRECIPIENT LTTRENCLIDCODE/NAME 11VISSING,G.

COPIESLTTRENCL11111111DENNOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR9ENCL9 lJII' ANDROCHESTER GASANDELECTRICCORPORATION

~89EASTAVfNLIE, ROCHESTER, N.Y14649-000I AREACODE7I6546-2700May6,1998USNuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProjectDirectorate 1-1Washington, DC20555

Subject:

MonthlyReportforApril,1998Operating StatusInformation R.E.GinnaNuclearPowerPlantDocketNo.50-244

DearMr.Vissing:

PursuanttoGinnaImprovedTechnical Specifications Section5.6.4,attachedisthemonthlyoperating statusreportforGinnaStationforthemonthofApril,1998.~Verytrulyyours,u.dJshA.WidaylantManagerxc:U.S.NuclearRegulatory Commission Mr.GuyS.Vissing(MailStop14B2)ProjectDirectorate I-1Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector Attachments 9805140326

'F80430POR,AOQCK05000244R."PDR=47)3gg okl OPERATING DATAREPORT50-244May6,1998COMPLETED BY:JohnV.WaldenTELEPHONE (716)771-3588OPERATING STATUS4801.UnitName:R.E.GINNANUCLEARPOWERPLANT2.Reporting Period:An'I,'I9983.DesignElectricRating(NetMWe):4704.MaximumDependable Capacity(NetMWe):Notes:ThisMonthYr.-to-Date Cumulative**

5.NumberofhoursReactorWasCritical6.HoursGenerator On-line7.UnitReserveShutdownHours8.NetElectrical EnergyGenerated (MWH)719.0719.00.0357410.02879.02879.00.01429793.0 200838.2197817.78.5*88971309.4

    • CUMULATIVE TOTALCOMMENCING NOVEMBER8,1969 1~aS11 l4DOCKETNO:50-244UNITNAME:R.E.GINNANUCLEARPOWERPLANTCOMPLETED BY:JohnV.WaldenUNITSHUTDOWNREPORTING PERIOD:Aril1998(Month/Year)

NO.DATETYPEF:FORCEDS:SCHEDULED DURATION(HOURS)REASON"'ETHOD OFSHUTTINGDOWN~2'AUSE/CORRECTIVE ACTIONSCOMMENTSSUMMARY:TheunitoperatedatfullpowerfortheentiremonthofApril.(1)Reason(2)MethodA-Equipment Failure(Explain)

B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining/License Examination F-Administrative G-Operational Error(Explain)

H-Other(Explain) 1-Manual2-ManualTrip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other(Explain) e.0t~pl9