ML26020A303

From kanterella
Revision as of 01:50, 11 February 2026 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Allegations Open
ML26020A303
Person / Time
Issue date: 01/20/2026
From: Sandra Mendez
NRC/OE
To:
References
Download: ML26020A303 (0)


Text

REACTOR OPEN ALLEGATIONS BY CY RECEIVED*: January 2021 - December 2025 Site 2021 2022 2023 2024 2025 Arkansas Nuclear One 1

3 Braidwood 3

1 Browns Ferry 1

1 Byron 1

Callaway 1

Calvert Cliffs 1

Catawba 1

Clinton 3

2 Columbia Generating Station 2

7 Comanche Peak 1

D.C. Cook 1

Davis-Besse 1

Dresden 1

Farley 3

Fermi 2

Grand Gulf 2

Harris 1

Limerick 3

McGuire 1

Millstone 1

Oconee 1

Palisades 2

2 Palo Verde 1

Point Beach 3

Quad Cities 2

5 1

River Bend 3

Saint Lucie 2

Salem/Hope Creek 1

2 Sequoyah 5

1 South Texas Project 1

Summer 1

Surry 4

Turkey Point 2

Vogtle AP 1000 +

2 Waterford 1

2 Watts Bar 3

Wolf Creek 2

+ Vogtle 3 began Operations on August 3, 2022, and Vogtle 4 began Operations on July 28, 2023.

  • This table refers to allegations from sources external to the NRC that are still under evaluation.

NON-OP REACTOR OPEN ALLEGATIONS BY CY RECEIVED*: January 2021 - December 2025 Site 2021 2022 2023 2024 2025 erraPower - Molten Chloride Fast Reactor (MCFR 1

Fort Calhoun 1

Hope Creek 2 1

Indian Point 1

Kewaunee 1

Oyster Creek 1

San Onofre 1

Three Mile Island 2 1

Wilmington, NC 1

Zion 1

  • This table refers to allegations from sources external to the NRC that are still under evaluation.

FUEL FACILITY OPEN ALLEGATIONS BY CY RECEIVED*: January 2021 - December 2025 Site 2021 2022 2023 2024 2025 American Centrifuge Operating, LLC 1

  • This table refers to allegations from sources external to the NRC that are still under evaluation.