ML21225A069
Jump to navigation
Jump to search
| Date released: 08/23/2021 | Download: ML21225A069 |
|---|---|
| ML21225A073 | |
| Person / Time | |
|---|---|
| Site: | Electric Power Research Institute |
| Issue date: | 06/22/2021 |
| From: | Joseph Holonich Licensing Processes Branch |
| To: | Burgos B Electric Power Research Institute |
| References | |
| EPID L-2019-PMP-0095, MRP-2021-011, TAC ME0680 | |
| Download: ML21225A073 (2) | |
| ML21225A071 | |
| Person / Time | |
|---|---|
| Site: | Electric Power Research Institute |
| Issue date: | 05/31/2021 |
| From: | Amberge K Electric Power Research Institute |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| EPID L-2019-PMP-0095, MRP-2021-011, MRP-231-NP, Rev. 4, TAC ME0680 | |
| Download: ML21225A071 (8) | |
| ML21225A070 | |
| Person / Time | |
|---|---|
| Site: | Electric Power Research Institute |
| Issue date: | 08/12/2021 |
| From: | Koehler C, Mcgill R Electric Power Research Institute |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EPID L-2019-PMP-0095, MRP 2021-011, TAC ME0680 | |
| Download: ML21225A070 (4) | |