Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000499/2025010
ML25213A189
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 08/04/2025
From: Greg Pick
NRC/RGN-IV/DORS/EB2
To: Kharrl C
South Texas
Pick G
References
IR 2025010
Download: ML25213A189 (1)


See also: IR 05000499/2025010

Text

August 04, 2025

Charles Kharrl, President

Chief Executive Officer and Chief Nuclear Officer

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNIT 2 -

REQUEST FOR INFORMATION FOR AN NRC POST-APPROVAL SITE

INSPECTION FOR LICENSE RENEWAL - INSPECTION REPORT

05000499/2025010

Dear Charles Kharrl:

On October 20, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a post-

approval site inspection for license renewal for Unit 2. Two inspectors will perform this 1-week

inspection in accordance with NRC Inspection Procedure 71003. This inspection will focus on

outage related activities to verify that license conditions added as part of your renewed license

and a sample of license renewal commitments have been implemented.

To minimize the inspection impact on the site and to ensure a productive inspection, we have

enclosed a request for information for the inspection. It is important that all these documents are

up to date and complete to minimize the number of additional documents requested during the

preparation and/or the on-site portions of the inspection. Insofar as possible this information

should be provided electronically to the lead inspector. This information request has been

divided into two groups:

The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. During the in-office preparation activities, the inspectors will identify as

much as possible the information and activities to be reviewed during the inspection. Please

provide this information by September 15, 2025.

The second group lists the additional information required for the inspectors to review the

selected activities. Please provide this information to the inspectors when they arrive onsite

October 20, 2025. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspectors as the documents are

generated.

C. Kharrl

2

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC

20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

The lead inspector for this inspection is Greg Pick. We understand that our licensing contact for

this inspection is Chris Warren of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at (817) 504-2105 or via

e-mail at greg.pick@nrc.gov.

Sincerely,

Greg Pick, Senior Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket No. 50-499

License No. NPF-80

Enclosure: Post-Approval Site Inspection for

License Renewal Request for Information

Signed by Pick, Gregory

on 08/04/25

ML25213A189

SUNSI Review

By: GAP

Non-Sensitive

 Sensitive

Publicly Available

 Non-Publicly Available

Keyword

NRC-002

OFFICE

BC:DORS/EB2

SRI:DORS/EB2

NAME

GWarnick

GPick

SIGNATURE

/RA/

/RA/

DATE

08/04/25

08/04/25

Enclosure

Post-Approval Site Inspection for License Renewal Request for Information

I.

Information Requested Prior to the On-Site Inspection - required by

September 15, 2025

The documents and information requested below should generally be made available to

the inspectors prior to the inspection. Electronic format is the preferred format, except

where specifically noted. If electronic files are made available via a secure document

management service, then the remote document access must allow inspectors to

download, save, and print the documents.

If a secure document management service is utilized, it is recommended that a separate

folder be used corresponding to each item listed below. It is recommended that multiple

documents within each folder be individually entered and for folders with ten or more

documents place them into a ZIP file uploaded into the same folder. Documents should

be identified by both document number and descriptive noun name.

1.

Provide a list of your license renewal commitments associated with appropriate

aging management programs. Include the completion status of each. For those

not yet complete, please provide an estimated completion date.

2.

Provide a list of your aging management programs, copies of the program basis

document for each and/or any associated plant program. Please include a listing

of the action tracking items for each.

3.

For aging management programs that are one-time inspection programs, provide

a list of completed work order numbers for inspections that have been

completed. This should include identification of the inspected component.

4.

Provide a listing of planned inspections that will be conducted during the onsite

week, credited for license renewal. This provides the inspectors with the ability to

observe activities and areas that are generally inaccessible at power (e.g.,

containment liner and containment coating inspections). If there are no

inspections planned, the inspectors will select areas normally inaccessible to

tour.

5.

Provide current management and license renewal organizational charts, as well

as contact information for aging management program owners and the license

renewal project staff.

6.

Provide copies of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

2

II.

Information Requested to be Available When the Inspectors Arrive On-Site on

October 20, 2025

1.

Copies of the work orders requested during the preparation week related to the

selected commitments/aging management programs. This will include work

orders for the inspections to be observed and completed work orders to be

reviewed by the inspectors.

2.

Contact information to facilitate inspector observation of the selected work

activities or evaluation of inaccessible areas.

3.

Documentation demonstrating completion of license renewal commitments

considered completed as of the inspection date. For example, this may include a

binder for each commitment, which includes implementing documentation and

references.

III. Information Requested to be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated because of the inspectors

questions or queries during this inspection.

2.

Copies of the list of questions submitted by the inspectors and the

status/resolution of the information requested (provide daily during the inspection

to each inspector).

If you have questions regarding the information requested, please contact the lead inspector.