ENS 57865
ENS Event | |
|---|---|
20:21 Aug 12, 2025 | |
| Title | Technical Specification Required Shutdown |
| Event Description | The following information was provided by the licensee via phone and email:
At 1621 EDT on 8/12/2025, a technical specification required shutdown was initiated at Davis-Besse Nuclear Power Station Unit 1. Technical specification limiting condition for operation 3.3.11 for steam generator (SG) low level instrumentation channel requirements was not met, and condition 'B' was entered on 8/12/2025 at 1600 with required actions to be in mode 3 with a completion time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and be in mode 4 with a completion time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. This event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(i). There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: The affected SG level instrumentation is for emergency feedwater automatic initiation. The instruments were declared inoperable due to a reference leg leak in containment. |
| Where | |
|---|---|
| Davis Besse Ohio (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
| LER: | 05000346/LER-2025-001 Required Shutdown for Steam Generator Low Level Instrumentation Reference Leg Steam Leak |
| Time - Person (Reporting Time:+-2.38 h-0.0992 days <br />-0.0142 weeks <br />-0.00326 months <br />) | |
| Opened: | Matthew Allan 17:58 Aug 12, 2025 |
| NRC Officer: | Robert A. Thompson |
| Last Updated: | Aug 12, 2025 |
| 57865 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 57865\u003C/a\u003E - \u003Ca href=\"/Davis_Besse\" title=\"Davis Besse\"\u003EDavis Besse\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETechnical Specification Required Shutdown\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 57865 - Davis Besse\n","link":"","lat":41.59545,"lon":-83.08950833333333,"icon":"/w/images/7/78/Cleveland_Electric_icon.png"}],"imageoverlays":null} | |
WEEKMONTHYEARENS 578652025-08-12T20:21:00012 August 2025 20:21:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 562842022-12-23T20:13:00023 December 2022 20:13:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 557342022-02-05T20:14:0005 February 2022 20:14:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 520792016-07-01T09:42:0001 July 2016 09:42:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Failure to Perform Technical Specification Required Shutdown ENS 413302005-01-13T14:49:00013 January 2005 14:49:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Entry Into Technical Specification Required Shut Down Due to Loss of Essential Bus 2025-08-12T20:21:00 | |