Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000455/2025011
ML24351A189
Person / Time
Site: Byron 
Issue date: 12/16/2024
From: Matthew Domke
NRC/RGN-III/DORS/ERPB
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2025011
Download: ML24351A189 (1)


See also: IR 05000455/2025011

Text

David Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, Il 60555

SUBJECT:

BYRON STATION UNIT 2 - REQUEST FOR INFORMATION FOR AN NRC

POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL INSPECTION

REPORT 05000455/2025011

Dear David Rhoades:

On April 14, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval

Site Inspection for License Renewal Phase 1 at Byron Station Unit 2. This inspection will be

performed in accordance with NRC Inspection Procedure (IP) 71003. This inspection will focus

on outage related activities to verify license conditions added as part of your renewed license

and a sample of license renewal commitments have been implemented.

To minimize the inspection impact on the site and to ensure a productive inspection for both

parties, we have enclosed a request for information needed for the inspection. It is important

that these documents are up to date and complete in order to minimize the number of requests

during the preparation and on-site portions of the inspection. Please provide this information

electronically to the lead inspector as far as you are able. This information request has been

divided into two groups:

The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. During the in-office preparation activities, the inspector will identify key

information and activities to be reviewed during the inspection. This information should be

provided to the inspector by March 17, 2025.

The second group includes the additional information required for the inspector to review the

selected activities. This information should be available to the inspector March 31, 2025. It is

also requested that corrective action documents and/or questions developed during the

inspection be provided to the inspector as the documents are generated.

The lead inspector for this license renewal inspection is Mr. Matthew Domke. We understand

that our primary contact for this inspection is Mr. Gerald Armstrong of your organization. If there

are any questions about the inspection or the material requested in the enclosure, please

contact the lead inspector at (630) 829-9562 or via email at Matthew.Domke@nrc.gov.

December 16, 2024

D. Rhoades

2

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS), accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

Matthew Domke, Senior Reactor Inspector

Engineering Reactor Projects Branch

Division of Operating Reactor Safety

Docket No. 05000455

License No. NPF-66

Enclosure:

Document Request for Post-Approval

Site Inspection for License Renewal

cc w/encl: Distribution via LISTSERV

Signed by Domke, Matthew

on 12/16/24

ML24351A189

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RIII

NAME

MDomke:anm

DATE

12/16/2024

DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

Enclosure

Inspection Report: 05000455/2025011

Inspection Dates:

April 14, 2025 - April 18, 2025

Inspection Procedure:

IP 71003 Post-Approval Site Inspection for License Renewal

Inspector:

Matthew Domke

(630) 829-9562

Matthew.Domke@nrc.gov

I.

Information Requested Prior to the On-Site Inspection Week by March 17, 2025

If you have any questions regarding this information, please call the inspector as soon

as possible. File names should be descriptive and indexed to facilitate ease of use.

Information lists should contain enough information to be easily understood by someone

who has knowledge of light water reactor technology.

1.

Provide a list of your license renewal commitments with an approximate

completion status of each.

2.

Provide a list of your Aging Management Programs (AMPs), program basis

documents for each, and a listing of the action tracking items for each.

3.

For AMPS that are one-time inspection programs, provide a list of work order

numbers for inspections that have been completed. This may be incorporated

with the previous item and should include identification of the inspected

component.

4.

Provide a list of the one-time inspections credited for license renewal that will be

completed during your upcoming outage. This list should include at least the

system, component, work order number, and type of inspection.

5.

Provide a listing of other planned inspections which will be conducted during the

outage that are credited for license renewal. Of particular interest are those that

provide observations of areas that are generally inaccessible at power, (e.g., tank

internal inspections, drywell liner inspections, and containment coating

inspections). Include work order numbers where applicable.

6.

Provide an outage schedule sufficiently detailed as to list the work orders noted

in Items 4 and 5.

2

7.

Provide current management and license renewal organizational charts.

8.

Provide electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

9.

Provide copies of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

II.

Information Requested to be Available for Inspection Preparation on

March 31, 2025

1.

Copies of the work orders requested prior to inspection preparation week. This

will include work orders of inspections to be observed and completed work orders

to be reviewed by the inspector.

2.

Documentation demonstrating completion of license renewal commitment which

are complete as of the inspection date. For example, this may be in the form of a

binder for each commitment which includes the implementing documentation and

references.

III.

Information Requested to be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated because of the teams

questions or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

If you have questions regarding the information requested, please contact the lead inspector.