Text
David Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, Il 60555
SUBJECT:
BYRON STATION UNIT 2 - REQUEST FOR INFORMATION FOR AN NRC
POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL INSPECTION
REPORT 05000455/2025011
Dear David Rhoades:
On April 14, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval
Site Inspection for License Renewal Phase 1 at Byron Station Unit 2. This inspection will be
performed in accordance with NRC Inspection Procedure (IP) 71003. This inspection will focus
on outage related activities to verify license conditions added as part of your renewed license
and a sample of license renewal commitments have been implemented.
To minimize the inspection impact on the site and to ensure a productive inspection for both
parties, we have enclosed a request for information needed for the inspection. It is important
that these documents are up to date and complete in order to minimize the number of requests
during the preparation and on-site portions of the inspection. Please provide this information
electronically to the lead inspector as far as you are able. This information request has been
divided into two groups:
The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. During the in-office preparation activities, the inspector will identify key
information and activities to be reviewed during the inspection. This information should be
provided to the inspector by March 17, 2025.
The second group includes the additional information required for the inspector to review the
selected activities. This information should be available to the inspector March 31, 2025. It is
also requested that corrective action documents and/or questions developed during the
inspection be provided to the inspector as the documents are generated.
The lead inspector for this license renewal inspection is Mr. Matthew Domke. We understand
that our primary contact for this inspection is Mr. Gerald Armstrong of your organization. If there
are any questions about the inspection or the material requested in the enclosure, please
contact the lead inspector at (630) 829-9562 or via email at Matthew.Domke@nrc.gov.
December 16, 2024
D. Rhoades
2
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS), accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
Matthew Domke, Senior Reactor Inspector
Engineering Reactor Projects Branch
Division of Operating Reactor Safety
Docket No. 05000455
License No. NPF-66
Enclosure:
Document Request for Post-Approval
Site Inspection for License Renewal
cc w/encl: Distribution via LISTSERV
Signed by Domke, Matthew
on 12/16/24
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
OFFICE
RIII
NAME
MDomke:anm
DATE
12/16/2024
DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
Enclosure
Inspection Report: 05000455/2025011
Inspection Dates:
April 14, 2025 - April 18, 2025
Inspection Procedure:
IP 71003 Post-Approval Site Inspection for License Renewal
Inspector:
(630) 829-9562
Matthew.Domke@nrc.gov
I.
Information Requested Prior to the On-Site Inspection Week by March 17, 2025
If you have any questions regarding this information, please call the inspector as soon
as possible. File names should be descriptive and indexed to facilitate ease of use.
Information lists should contain enough information to be easily understood by someone
who has knowledge of light water reactor technology.
1.
Provide a list of your license renewal commitments with an approximate
completion status of each.
2.
Provide a list of your Aging Management Programs (AMPs), program basis
documents for each, and a listing of the action tracking items for each.
3.
For AMPS that are one-time inspection programs, provide a list of work order
numbers for inspections that have been completed. This may be incorporated
with the previous item and should include identification of the inspected
component.
4.
Provide a list of the one-time inspections credited for license renewal that will be
completed during your upcoming outage. This list should include at least the
system, component, work order number, and type of inspection.
5.
Provide a listing of other planned inspections which will be conducted during the
outage that are credited for license renewal. Of particular interest are those that
provide observations of areas that are generally inaccessible at power, (e.g., tank
internal inspections, drywell liner inspections, and containment coating
inspections). Include work order numbers where applicable.
6.
Provide an outage schedule sufficiently detailed as to list the work orders noted
in Items 4 and 5.
2
7.
Provide current management and license renewal organizational charts.
8.
Provide electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical Requirements
Manual.
9.
Provide copies of any internal/external self-assessments and associated
corrective action documents generated in preparation for the inspection.
II.
Information Requested to be Available for Inspection Preparation on
March 31, 2025
1.
Copies of the work orders requested prior to inspection preparation week. This
will include work orders of inspections to be observed and completed work orders
to be reviewed by the inspector.
2.
Documentation demonstrating completion of license renewal commitment which
are complete as of the inspection date. For example, this may be in the form of a
binder for each commitment which includes the implementing documentation and
references.
III.
Information Requested to be Provided Throughout the Inspection
1.
Copies of any corrective action documents generated because of the teams
questions or queries during this inspection.
2.
Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection
to each team member).
If you have questions regarding the information requested, please contact the lead inspector.