05000296/LER-1980-032-03, /03L-0:on 800825,while Performing Reactor Core Isolation Cooling Steam Line Space High Temp SI 4.2.B-32, Lead Wires Were Accidentally Pulled Out of Speed Feedback Magnetic Pickup Connector.Caused by Personnel Error

From kanterella
Revision as of 01:21, 26 May 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Redirect page
Jump to navigation Jump to search