TAC:60467
From kanterella
Revision as of 20:45, 23 May 2025 by
StriderTol
(
talk
|
contribs
)
(StriderTol Bot change)
(
diff
)
← Older revision
| Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
TAC
-
60467
, (Open)
4 May 1984 - 27 May 1986
Request for:
Open
Initiation
Request...
Acceptance...
Withholding Request...
Meetings...
Questions
Answers
Results
Approval
,
Approval
Other:
AECM-84-0252, Special Rept 83-067/3:on 830819,during Scheduled Surveillance on Four Pipe Mounted Triaxial Peak Recording Accelerographs Used for Seismic Monitoring,Instruments Damaged Due to over-ranging.Design Changes Under Way
,
AECM-84-0307, Submits Commitment to Evaluate Design of Certain Seismic Monitoring Instruments to Determine Location,Range & Type of Instrument Prior to Restart Following First Refueling Outage.Proposed Tech Spec Changes Will Be Submitted
,
AECM-86-0006, Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid
From
Grand Gulf
|
[Open (286)]
|
[Closed (193)]
[list all from site]
MONTH
YEAR
AECM-84-0252, Special Rept 83-067/3:on 830819,during Scheduled Surveillance on Four Pipe Mounted Triaxial Peak Recording Accelerographs Used for Seismic Monitoring,Instruments Damaged Due to over-ranging.Design Changes Under Way
1984-05-04
0
4 May 1984
Special Rept 83-067/3:on 830819,during Scheduled Surveillance on Four Pipe Mounted Triaxial Peak Recording Accelerographs Used for Seismic Monitoring,Instruments Damaged Due to over-ranging.Design Changes Under Way
AECM-84-0307, Submits Commitment to Evaluate Design of Certain Seismic Monitoring Instruments to Determine Location,Range & Type of Instrument Prior to Restart Following First Refueling Outage.Proposed Tech Spec Changes Will Be Submitted
1984-05-31
0
31 May 1984
Submits Commitment to Evaluate Design of Certain Seismic Monitoring Instruments to Determine Location,Range & Type of Instrument Prior to Restart Following First Refueling Outage.Proposed Tech Spec Changes Will Be Submitted
AECM-86-0006, Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid
1986-01-10
0
10 January 1986
Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid
ML20205S215
1986-05-27
0
27 May 1986
Safety Evaluation Supporting Util 860110 Proposal to Remove Four Peak Recording Accelerographs Mounted on Reactor Piping
ML20205S202
1986-05-27
0
27 May 1986
Forwards Safety Evaluation Supporting Util 860110 Proposal to Remove Four Peak Recording Accelerographs Installed on Reactor Piping Due to Inoperability Caused by Operating Transients & Adequacy of Other Seismic Instrumentation
1984-05-04
[table view]
Category
:
TAC
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View form
View source
View history
More
Refresh
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties