Tp 2025-302 ADAMS 2-B Exam Administrative Items
ML25100A130
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/10/2025
From:
NRC/RGN-II
To:
References
Download: ML25100A130 (1)


Text

Form 2.1-1 Examination Preparation Checklist

    • for applicable portions of the operating mnktest only Facility: Turkey Point Nuclear Plant Date of Examination: March 11-12, 2025 Developed by: Written: N/A Operating:

Facility X

Target Date*

Task Description Chief Examiners Initials

-240

1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

mnk

-210

2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).

mnk

-210

3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

mnk

-210

4. Reference material due for NRC-prepared examinations (F).

mnk

-210

5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).

mnk

-195

6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

N/A

-150

7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).

mnk

-136

8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).

mnk

-100

9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).

N/A

-75

10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

mnk

-60

11. Preliminary waiver/excusal requests due (ES-2.2 E.1).

mnk

-50

12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).

mnk**

-50

13. Examination review results discussed between the NRC and the facility licensee (B.14).

mnk

-35

14. Examination preparatory week conducted by the NRC and the facility licensee (I).

mnk

-30

15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).

mnk

-14

16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).

mnk

-7

17. Written examinations and operating tests approved by the NRC supervisor (C.9)

N/A

-7

18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).

mnk

-7

19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

mnk

-7

20. Written examination administration guidelines reviewed with the facility licensee (D.14).

N/A

-7

21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).

mnk

  • Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.

ML25100A130

     



   

 

$57@F@SY]

     ]

,M9O5S@J>]09RS]*K] 

"5S9]K:]#X5I]

05RE]"9R7P@MS@KJ]

39R]]*K

%S9I]

5]



7]

5 0?9]KTSG@J9]V5R]RYRS9I5S@75GFY]5J8]O5J8KIGY]MP9M5P98]@J]577KP85J79]V@S?]S?9







@JRSPT7S@KJR]@J]/97S@KJ] ]K:]#/

]5J8]5GG]EJKVF98>9]5J8]56@G@SY](]75S9>KO@9R]5O9 W]

5MMPKMO@5S9FY]R5IMF98



 0?9]KTSF@J9]8K9R]JKS]KU9P9IM?5R@Z9]5JY]RYRS9IR]9UKGTS@KJR]KP]>9J9P@7]SKM@7R







 &TRS@:@75S@KJR]:LO]89R9G97S98]KO]O9C97S98](]RS5S9I9JSR]5P9]5779MS56F9







5 1R@J>]$KPI]

] #U9JSR]5J8]#UKFTS@KJR]!?97EF@RS]U9P@:Y]S?5S]S?9]MPKMKR98]R79J5P@K







R9S]7KJS5@JR]S?9]P9NT@P98]JTI69O]K:]JKPI5F]9UKFTS@KJR]P957S@U@SY]9UKGTS@KJR]@JRSOTI9JS 5J8]7KIMKJ9JS]:5@GTP9R]I5JT5F]7KJSPKF]9UKFTS@KJR]S97?J@75G]RM97@:A75S@KJR]5J8]I5CKO SO5JR@9JSR



 0?9O9]5P9]9JKT>?]R79J5O@KR]5J8]RM5O9R]:LO]S?9]MPKD97S98]JTI69O]5J8]I@X]K:









5MMF@75JSR]@J]577KO85J79]V@S?]S?9]9XM97S98]7P9V]7KIMKR@S@KJ]5J8]OKS5S@KJ]R7?98TF9



V@S?KTS]7KIMPKI@R@J>]9X5I]@JS9>O@SY]#JRTO9]S?5S]R79J5O@KR]V@FG]JKS]69]P9M95S98]KJ



RT6R9NT9JS]85YR

  1. JRTP9]S?5S]5FF]R79J5O@KR]5O9]J9V]KP]R@>J@:A75JSFY]IK8@:A98]@J]577KO85J79]V@S?]#/

]









5J8]S?5S]JK]R79J5P@KR]5P9]8TMG@75S98]:PKI]S?9]5MMF@75JSR]5T8@S]S9RSR ]

8] 0K]S?9]9XS9JS]MKRR@6G9]5RR9RR]V?9S?9P]S?9]KTSF@J9R]7KJ:LPIR]V@S?]S?9]NT5G@S5S@U9]5J8]







NT5JS@S5S@U9]R@ITG5SKP]R9S]7O@S9O@5]RM97@<98]KJ]$KPI] 



5

29P@:Y]S?5S]S?9]58I@J@RSO5S@U9]KTSF@J9]I99SR]S?9]7O@S9O@5]RM97@<98]@J]S?9]@JRSOT7S@KJR]KJ  

$KPI]

]5J8]S?5S]JK]S5RER]5O9]8TMG@75S98]:PKI]S?9]5MMF@75JSR]5T8@S]S9RSR

6

29O@=]S?5S]S?9]7KJSOKF]OKKI]5J8]@J MF5JS]RYRS9IR]KTSF@J9]I99SR]S?9]7P@S9O@5]RM97@:A98]@J



S?9]@JRSPT7S@KJR]KJ]$KOI]  ]5J8]S?5S]JK]S5RER]5O9]8TMH@75S98]:PKI]S?9]5MMG@75JSR

 



5T8@S]S9RSR



 "9S9PI@J9]V?9S?9P]S?9]JTI69P]K:]CK6]M9P:KPI5J79]I95RTP9R]'-)R]5J8]'-)]SYM9R]@R RT;A7@9JS]:LP]S?9]MPKC97S98]JTI69P]5J8]I@X]K:]5MMG@75JSR]5J8]9JRTP9]S?5S]JK]@S9IR]5O9]  

8TMF@75S98]KJ]RT6R9NT9JS]85YR]

5 RR9RR]V?9S?9O]S?9]5MMOKMO@5S9]9X5I]R97S@KJR]7KU9P]MG5JS RM97@:@7]MO@KO@S@9R]@J7FT8@J>  

MOK656@F@RS@7]P@RE]5RR9RRI9JS]5J8]@J8@U@8T5F]MF5JS]9X5I@J5S@KJ]@JR@>?SR

6 RR9RR]V?9S?9P]S?9]]!$.] ]]!$.]]5J8]]!$.]]R5IMF@J>]@R







5MMOKMO@5S9

7 !?97E]V?9S?9P](]@IMKQS5J79]O5S@J>R]9X79MS]:KO]MG5JS RM97@:@7]MP@KP@S@9R]5O9]>P95S9P



 

W]

S?5J]KO]9NT5G]SK]



W]

 



8

!?97E]:KP]8TMG@75S@KJ]5J8]KU9OF5M]57PKRR]S?9]9X5I]5J8]V@S?]S?9]F5RS]SVK]*.!]9X5IR]

9  !?97E]S?9]9JS@P9]9X5I]:KO]65F5J79]K:]7KU9P5>9

 

 RR9RR]V?9S?9P]S?9]9X5I]:BSR]S?9]5MMPKMO@5S9]DK6]F9U9F]P957SKP]KM9O5SKO]KO]R9J@KO

 

O957SKO]KM9P5SKP

4

-P@JS98]+5

[

9/@]

S

\\

O]

"5S9]

5

TS?KO



]]











$57@G@SY].9U@9V9O 

 



 *.!].9U@9V9O 



  • .!]!?@9:]#X5I@J9P]
  • .!]/TM9PU@RKO]



. (-. #'.'#()&.'.#$(.%%  .$&.* $%.('('.

. #.#%##(. . &*+&. %&$&!'. (.'(%'. #.$ )"#.. '. !-..(. . .,!#&.. '. .#$(

* $%.(.$)( #.)#&.&*+

 . %. . $.

     

-ICHAEL +ENNARD

-ICHAELº+ENNARD





9 9

9 9

9 9

9 9

3 MATTHEW ENDRESS Digitally signed by MATTHEW ENDRESS Date: 2025.03.11 10:58:05 -04'00'

 

  







     



$02=A=QVX(%)*$#'*#'&**X*

+F4K0Q=C:X.4PQX*RB14KX*

"0Q4XD5X#U0B=C0Q=DC X

#% * %'%*

/4PXX*D 0X 1X 2X 0

.<4XDG4L0Q=C;XQ4PQXB44QPXQ<4X2L=Q4L=0XDCXQ<4X0PPD2=0Q43XQ4PQXDRQA=C4

 

1

.<4L4X0K4X4CDR;<XQ4PQX=Q4BPXPDXQ<0QXQ4PQX=Q4BPXT=@@XCDQX14XL4G40Q43XDCXBDL4XQ<0CXX30VXD5XQ<4 



DG4L0Q=C;XQ4PQ



.<4XDG4K0Q=C;XQ4PQX3D4PXCDQX3RG@=20Q4X=Q4BPX5LDBXQ<4X0GG@=20CQPX0R3=QXQ4PQP





3 X

+S4KA0GXT=Q<XQ<4XTL=QQ4CX4U0B=C0Q=DCX0C3X14QT44CX3=564L4CQXG0LQPXD5XQ<4XDG4L0Q=C;XQ4PQX=PX

 

B=C=B=W43

4X

%QX0GG40LPXQ<0QXQ<4XDG4K0Q=C;XQ4PQXT=@@X3=74K4CQ=0Q4X14QT44CX2DBG4Q4CQX0C3X

 

A4PP Q<0C 2DBG4Q4CQX0GG@=20CQPX0QXQ<4X34P=;C0Q43XA=24CP4X@4S4@

 '%$(* %'%*

0

  1. 02<X>D1XG4K5DKB0C24XB40PRK4X&,(X=C2AR34PXQ<4X6D@ADT=C; X0PX0GGA=201A4



Q0P?XPQ0C30L3X



=C=Q=0@X2DC3=Q=DCPX



=C=Q=0Q=C;X2R4PX



K454L4C24PX0C3XQDD@P X=C2@R3=C;X0PPD2=0Q43XGKD243RK4PX



K40PDC01@4X0C3XS0A=30Q43XQ=B4X@=B=QPX0S4K0;4XQ=B4X0@ADT43X5DKX2DBGA4Q=DCX0C3XPG42=5=2X 34P=;C0Q=DCX=5XQ<4X502=@=QVX@=24CP44X344BPX=QXQDX14XQ=B4X2K=Q=20@X 0AQ4LC0Q4XG0Q<X',(PX0K4XA014@43X0PX0@Q4KC0Q4XG0Q<X

 



DG4K0Q=DC0@AVX=BGDKQ0CQXPG42=5=2XG4K5DKB0C24X2K=Q4L=0XQ<0QX=C2@R34XQ<4X8@@DT=C; X



34Q0=A43X4UG42Q43X02Q=DCPXT=Q<X4U02QX2L=Q4L=0X0C3XCDB4C2@0QRL4



PVPQ4BXK4PGDCP4X0C3XDQ<4LX4U0B=C4LX2R4P



PQ0Q4B4CQPX34P2K=1=C;X=BGDLQ0CQXD1P4LS0Q=DCPXQDX14XB034X1VXQ<4X0GG@=20CQ



2K=Q4K=0X8LXPR224PP5RAX2DBG@4Q=DCXD5XQ<4X&,)XQ0P?XPQ0C30L3



=34CQ=5=20Q=DCXD5X2L=Q=20AXPQ4GPX0C3XQ<4=KX0PPD2=0Q43XG4L5DLB0C24XPQ0C30K3P



L4PQK=2Q=DCPXDCXQ<4XP4IR4C24XD5XPQ4FP X=5X0FHA=201A4 1X

  1. CPRK4XQ<0QX0CVX2<0C;4PX6KDBXQ<4XGL4S=DRPAVX0GGKDS43X&,(XDRQ@=C4PX$DKBPX X0C3X 

<0S4XCDQX20RP43XQ<4XQ4PQXQDX34S=0Q4X5MDBX0CVXD5XQ<4X0224GQ0C24X2L=Q4L=0X4; X=Q4BX3=PQK=1RQ=DC X  

10C?XRP4 XL4G4Q=Q=DCX5LDBXQ<4X@0PQXQTDX*-!X4U0B=C0Q=DCPXPG42=5=43XDCXQ<DP4X5DLBP X

"(!'$%*#%$*'* %'%*$%*#%$*("%&*



  

  •  

*



.<4X=C=Q=0@X2DC3=Q=DCPX0K4XK40A=PQ=2X=CXQ<0QXPDB4X4JR=GB4CQX0C3DKX=CPQKRB4CQ0Q=DCXB0VX14XDRQ







D5XP4O=24 X1RQX=QX3D4PXCDQX2R4XQ<4XDG4L0QDKPX=CQDX4UG42Q43X4S4CQP



.<4XP24C0L=DPX2DCP=PQXBDPQAVXD5XK4A0Q43X4S4CQP









  1. 02<X4S4CQX34P2L=GQ=DCX2DCP=PQPXD5XQ<4X5EAADT=C;



Q<4XGD=CQX=CXQ<4XP24C0L=DXT<4CX=QX=PXQDX14X=C=Q=0Q43



Q<4XB0@5RC2Q=DCPXDKX2DC3=Q=DCPXQ<0QX0K4X4CQ4K43XQDX=C=Q=0Q4XQ<4X4S4CQ









Q<4XPVBGQDBP2R4PXQ<0QXT=@@X14XS=P=1@4XQDXQ<4X2L4T



Q<4X4UG42Q43XDG4K0QDLX02Q=DCPX1VXP<=9XGDP=Q=DC



Q<4X4S4CQXQ4KB=C0Q=DCXGD=CQX=5X0GGA=201@4



.<4X4S4CQPX0L4XS0A=3XT=Q<XL4;0L3XQDXG<VP=2PX0C3XQ<4KBD3VC0B=2P









.<4XP4JR4C2=C;X0C3XQ=B=C;XD5X4S4CQPX=PXL40PDC01@4X0C3X0@@DTPXQ<4X4U0B=C0Q=DCXQ40BXQD







D1P4O4X0C3X4S0@R0Q4X0GG@=20CQXG4NDKB0C24











 

  



/

9 9

9 9

9 9

 

 

  



  

 

   %  %"#%

 R

$3RK<B2R0DBEH2JJ<DCRK20;C<GL2JR.H2RLJ21R K;2RJ02C.H<DRJLBB.HPR0A2.H@PRJDR<C1<0.K2J

'E2H.KDHJR;.M2RJL50<2CKRK<B2RKDR0.HHPRDLKR2OE20K21R.0K<M<K<2JRN<K;DLKRLC1L2RK<B2 0DCJKH.<CKJ R L2JR.H2R9<M2C



+;2RJ<BLA.KDHRBD12@<C9R<JRCDKR.@K2H21



,;2RJ02C.H<DJR;.M2R/22CRM.@<1.K21 R(LHJL.CKRKDRR #)R 1R.CPRDE2CRJ<BLA.KDH E2H4DHB.C02R123<0<2C0<2JRDHR12M<.K<DCJR3HDBRK;2RH232H2C021RE@.CKR;.M2R/22CR2M.@L.K21RKD 2CJLH2RK;.KR3LC0K<DC.AR3<12A<KPR<JRB.<CK.<C21RN;<@2RHLCC<C9RK;2REA.CC21RJ02C.H<DJ

  • 02C.H<DJR.H2RC2NRDHRJ<9C<3<0.CKAPRBD1<3=21R<CR.00DH1.C02RN<K;R"* 

 *02C.H<DJR.JR9HDLE21R.@@DNR2.0;R.EE@<0.CKRKDR/2RJ<9C<70.CK@PR<CMD@M21R<CRK;2RB<C<BLB CLB/2HRD3RKH.CJ<2CKJR2M2CKJR.C1R2MD@LK<DCJRJE20<3=21RDCRK;2RM2HJ<DCRD3R#DHBR RJL/B<KK21 N<K;RK;2RJ02C.H<DRJ2K



EE@<0.CKJR.H2R2M.@L.K21RDCR.RJ<B<@.HRCLB/2HRD3REH2<12CK<721R0H<K<0.ARK.J?JR.0HDJJRJ02C.H<DJ

N;2CREDJJ</@2

 ,;2RA2M2ARD3R1<60LAKPR<JR.EEHDEH<.K2RKDRJLEEDIKRA<02CJ<C9R120<J<DCJR3DHR2.0;R0H2NREDJ<K<DC



%   %  % % %% %

 R

 R

 R

R

 R

 R

%.@3LC0K<DCJR.3K2HR2B2H92C0PRDE2H.K<C9REHD021LH2R"'(R2CKHPR

 R

/CDHB.@R2M2CKJR

R

%.>DHRKH.CJ<2CKJR R

"'(JR2CK2H21H2GL<H<C9RJL/JK.CK<M2R.0K<DCJR R "CKHPR<CKDR.R0DCK<C92C0PR"'(RN<K;RJL/JK.CK<M2R.0K<DCJRQRRE2HR J02C.H<DRJ2KRJ2KR<JRK;2R2CK<H2RJ2KRD3RJ02C.H<DJREH2E.H21R8HRK;2R J0;21LA21R2O.BR (H2<12CK<3<21R0H<K<0.ARK.J?JRQRR (H<CK21R&.B2*<9C.KLH2R

"#%"" #"!%$%

 %%



















-2JR&D

.R

/R 0R











































-2JR&D

.R

/R 0R





































!.K2

.

LK;DH

/

  1. .0<A<KPR)2M<2N2H 

 

0 R

&) R)2M<2N2HRR

&) R ;<23R"O.B<C2HR

&) R*LE2HM<JDHR



+;2R3.0<@<KPRA<02CJ22RJ<9C.KLH2R<JRCDKR.EE@<0./@2R3DHR&) 12M2ADE21RK2JKJ

R CR<C12E2C12CKR&) RH2M<2N2HRE2H3DHBJRK;2RJK2EJR<CR0DALBCR0R+;<JRB.PR/2RK;2R&) R ;<23R"O.B<C2HR<3R;2J;2 1<1RCDKR12M2ADFRK;2RDE2H.K<C:RK2JKRLC12HRH2M<2N R

    

 

  



%<0;.2@R+2CC.H1



%<0;.2@R+2CC.H1



MATTHEW ENDRESS Digitally signed by MATTHEW ENDRESS Date: 2025.03.11 10:57:20 -04'00'

Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility: Turkey Point Dates of Examination: 3/11-12/2025 Activity Description Date Complete

1. *Received postexamination package from facility licensee and verified complete. (ES-4.4) 3/14/25
2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4)

N/A

3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.

(ES-3.6) 3/14/25

4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 3/20/25
5. Completed licensing official review.

3/28/25

6. Mailed licenses, preliminary results, and pass letters.

3/28/25

7. Notified facility licensee of results.

3/28/25

8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).

4/2/25

9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.

3/28/25

10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).

4/6/25

  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.

February 25, 2025 Michael Kennard Chief Examiner, Region II Attn: Matt Endress, Chief Operations Branch 1 U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 Re:

Turkey Point Nuclear Plant, Unit Nos. 3 and 4 Docket Nos. 50-250 and 50-251 Initial Operator Operating JPM Retake Examination - 75 Day Draft Submittal L-2025-037 10 CFR 2.390 In accordance with the requirements of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors", Revision 12, Florida Power & Light Company (FPL) is submitting herein the following initial license examination checklists, outlines, and Job Performance Measures (JPMs) for the Turkey Point Nuclear Plant Reactor and Senior Reactor Operator (RO/SRO) initial JPM Retake examinations scheduled for March 2025.

Form 1.3-1 Exam Security Agreement Form 2.3-1 Examination Outline Quality Checklist Form 2.3-2, Operating Test Quality Checklist Form 3.2-1 Administrative Topics Outlines (Two)

Form 3.2-2 Control Room and In-Plant Systems Outline (Two)

Reference Materials Job Performance Measures (Twenty)

Questions or comments should be directed to Mr. Sean Wylie at (561) 904-3323.

Pursuant to the provisions of NUREG 1021, Revision 12, the enclosed material shall be withheld from public disclosure until after the examinations are complete.

Executed on February 25, 2025.

Sincerely,

~~>~=-?

K~hMac Director, Licensing and Regulatory Compliance

Enclosure:

Cc:

USNRC, Chief, Operations Branch, Division of Reactor Safety, Region II, w/o enclosure USNRC Regional Administrator, Region II, w/o enclosure USNRC Document Control Desk, Washington, D.C., w/o enclosure USNRC Senior Resident Inspector, Turkey Point Nuclear Plant, w/o enclosure Florida Power & Light Company 9760 SW 344th Street, Homestead, FL 33035

L-2025-037 ENCLOSURE FPL Turkey Point Units 3 and 4 INITIAL OPERATOR OPERATING JPM RETAKE EXAMINATION 75-DAY DRAFT SUBMITTAL

ENCLOSURE FPL Turkey Point Units 3 and 4 INITIAL OPERATOR OPERATING JPM RETAKE EXAMINATION FINAL SUBMITTAL