Initial Exam - Written Exam Performance Analysis and Applicant Questions
ML013600061
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/07/2002
From: Gody A
NRC Region 4
To: Maynard O
Wolf Creek
References
50-482/01301
Download: ML013600061 (9)


Text

Wolf Creek Generating Station Initial License Written Exam 2001 Exam Analysis Results A study was made of the questions missed by 50 % or more of the applicants. Questions missed were:

  1. 25 Common.
  1. 41 Common.
  1. 44 Common.
  1. 59 Common.
  1. 73 Common.
  1. 80 RO Only
  1. 89 RO Only
  1. 82 SRO Only
  1. 87 SRO Only
  1. 88 SRO Only
  1. 92 SRO Only
  1. 96 SRO Only
  1. 97 SRO Only Of the 13 questions reviewed the following is the only substantive item.
1. Question #97 SRO. All SRO applicants missed this question. The answer is taken from the procedure for duties and responsibilities of the Control Room Supervisor, which would be required knowledge. However Hazardous Material training does not occur until after the licensing process is complete. The applicants apparently did not feel they would be asked any hazardous material questions since they had not been specifically trained on this topic yet, even though this responsibility was included in a previously covered lesson.

Question #Correct Answer RO3 U

RO1 SO3 SO2 RO2 SO1

> 50% 4 misses 1 c 2 a 3 d 4 d b

5 b 6 a 7 c b

8 c 9 b d

d 10 a c

11 b c

a a

12 c a

a b

13 b 14 b c

15 a 16 c 17 c d

18 b c

19 d c

20 a 21 c 22 a b

d 23 b 24 c b

25 d b

b a

b 25 26 c a

27 d 28 a 29 a 30 b c

31 a 32 b d

33 c 34 c 35 d 36 d a

c 37 b 38 a 39 c d

40 a c

41 c a

a a

a 41 42 b 43 c 44 b d

d d

a c

a 44 45 b d

c a

46 b 47 c

48 d 49 a 50 b a

51 d 52 b c

53 d 54 c 55 c 56 c 57 d 58 a d

59 a d

c b

d b

59 60 d c

61 b 62 b 63 a 64 c a

65 d c

66 a c

67 a 68 c a

69 b d

70 d b

a c

71 c a

72 a 73 d a

c c

c 73 74 b a

75 c

50% 4 misses

Question #CA RO3 RO2 RO1

> 50% 2 misses 76 a 77 d 78 b a

79 c 80 d b

b 80 81 d 82 c 83 a 84 c 85 d 86 d 87 b 88 d 89 b d

d 89 90 a 91 a c

92 b 93 b a

94 c 95 a 96 c 97 b 98 c 99 b a

100 d

Question #Correct Answer SO2 U

SO1 SO3

> 50% Missed 2 misses 76 a 77 d c

78 b 79 c 80 d 81 d 82 c a

a 82 83 a 84 c 85 d 86 d 87 b a

d c

c 87 88 d c

a 88 89 b d

90 a c

91 a d

92 b a

a a

92 93 b d

94 c a

95 a 96 c b

b a

96 97 b d

d d

d 97 98 c 99 b 100 d

Wolf Creek Generating Station Initial License Written Exam 2001 Applicant Questions The following is a list of questions asked by the applicants and the answers provided. Questions resulting in changes to the exam were noted on the master answer key.

1. Applicant: RO1 Question: #32, Do I assume Bus Lockout on NB02?

Response: Changed master to read, Legitimate bus fault caused the supply breaker to trip.

2. Applicant: RO1 Question: #73, stated can not initiate B train only as implied by answer D.

Response: Use the information provided.

3. Applicant: RO2 Question: #5, Should question read reducing pressure vice reduced pressure.

Response: Changed master answer key to read, reducing.

4. Applicant: RO2 Question: #47, In mode 6 with head detensioned, is head still in place?

Response: Use the information provided.

5. Applicant: SO1 Question: #72, What is specifically meant by Tagging Audit, is this a Second Verification?

Response: Any procedure that has tags associated with it is audited on recurring bases.

6. Applicant: SO2 Question: #9, Is Technical Specification 3.6.3 excluded?

Response: Nothing is excluded.

7. Applicant: SO2 Question: #11, Do I need to assume that pressure is needed for PTS to occur?

Response: Use the information provided.

8. Applicant: SO2 Question: #51, Do I assume no operator action?

Response: Yes

9. Applicant: SO2 Question: #SRO81, Do you want to know what I will do right now or eventually?

Response: What course will mitigate the accident.

10. Applicant: SO2 Question: #47, Answers A and C are both correct.

Response: Modified distractor A as noted on master answer key.

11. Applicant: SO3 Question: #16, Did the rate of change go positive or just slowed?

Response: Rate slowed but pressure continued to decrease.

12. Applicant: Upgrade Question: #53, Has the Containment Recirc swapover not occurred?

Response: All systems functioned as designed.

13. Applicant: Upgrade Question: #SRO86, Adverse Containment is indicated but Gamma metrics not listed.

Response: Gamma Metrics indications equal Power Range indications