ML020710077

From kanterella
Revision as of 19:41, 16 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Senior Reactor and Reactor Operator Initial Examinations - Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Dtd 3/11/02
ML020710077
Person / Time
Site: Calvert Cliffs  
Issue date: 03/11/2002
From: Conte R
NRC Region 1
To: Cruse C
Constellation Nuclear
Shared Package
ML020580381 List:
References
05000317/02-301, 05000318/02-301 05000317/02-301, 05000318/02-301
Download: ML020710077 (4)


Text

March 11, 2002 Mr. Charles H. Cruse Vice President Constellation Nuclear Calvert Cliffs Nuclear Power Plant, Inc.

1650 Calvet Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS -

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2

Dear Mr. Cruse:

In telephone conversations on March 7, 2002, between Mr. Joseph DAntonio, Examiner/Inspector, and Mr. John Hornek, Supervisor - Initial License Training, arrangements were made for the administration of licensing examinations at Calvert Cliffs during the week of July 15, 2002.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by the week of May 6, 2002. The written examinations, operating tests, and the supporting materials requested by Mr. DAntonio will be due by the week of June 3, 2002.

Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

Mr. Charles H. Cruse To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on April 30, 2003. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Hornek has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. DAntonio at (610) 337-5085, or me at (610) 337-5183.

Sincerely,

/RA by R. V. Crlenjak for/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos.

50-317, 50-318 License No.

DPR-53, DPR-69

Mr. Charles H. Cruse cc:

M. Geckle, Director, Nuclear Regulatory Matters (CCNPPI)

R. McLean, Administrator, Nuclear Evaluations K. Burger, Esquire, Maryland People's Counsel R. Ochs, Maryland Safe Energy Coalition J. Petro, Constellation Power Source State of Maryland (2)

J. Hornek, Supervisor - Initial License Training

Mr. Charles H. Cruse Distribution:

H. Miller, RA/J. Wiggins, DRA T. Bergman, RI EDO Coordinator D. Beaulieu - SRI - Calvert Cliffs E. Adensam, NRR (ridsnrrdlpmlpdi)

D. Skay, PM, NRR P. Tam, PM, NRR (Backup)

M. Evans, DRP W. Cook, DRP S. Barr, DRP P. Torres, DRP R. Junod, DRP Region I Docket Room (with concurrences)

W. Lanning, DRS R. Crlenjak, DRS J. DAntonio, DRS, Chief Examiner C. Buracker, DRS (OL Facility File)

R. Conte, DRS DOCUMENT NAME: G:\\OSB\\DANTONIO\\CALVERTCLIFFSEXAMJULY2002\\CC120DAYEXAMLTR.WPD ADAMS PKG: ML020580381 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRS NAME CBuracker JDAntonio RConte (RVC for)

DATE 03/11/02 03/11/02 03/11/02 03/ /02 03/ /02 OFFICIAL RECORD COPY